Por favor, use este identificador para citar o enlazar este ítem:
http://dspace.espoch.edu.ec/handle/123456789/6364
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Guamán Mendoza, Ángel Rigoberto | - |
dc.contributor.author | Tutalcha Benavides, Eduardo David | - |
dc.date.accessioned | 2017-05-10T14:52:03Z | - |
dc.date.available | 2017-05-10T14:52:03Z | - |
dc.date.issued | 2017-01-26 | - |
dc.identifier.citation | Tutalcha Benavides, Eduardo David. (2017). Estudio de la gestión de riesgos existentes en el taller del GAD Municipal del Cantón Guano. Escuela Superior Politécnica de Chimborazo. Riobamba. | es_ES |
dc.identifier.uri | http://dspace.espoch.edu.ec/handle/123456789/6364 | - |
dc.description | El presente trabajo de Titulación se refiere al “Estudio de la Gestión de Riesgos existentes en el Taller transporte y maquinaria del GAD Municipal del Cantón Guano.” El proyecto tiene como objetivo preservar la integridad y salud del talento humano e instalaciones físicas en base a las normas nacionales e internacionales vigentes, utilizando como metodología la Resolución N°: C.D 333, Capitulo II, Art. 9 numeral 2. Del IESS, “Gestión Técnica”. Para empezar se realizó un análisis de la situación actual en los siguientes puestos de trabajo: mecánica automotriz, soldadura, electricista, guardalmacén, chofer de vehículos livianos, operador de equipo caminero, debido a que estos presentan más peligros. Utilizando diagramas de procesos como herramienta para analizar los diferentes tipos de actividades lo que me permitió identificar los riesgos existentes en cada una de las áreas y puestos de trabajo y se procedió a determinada su severidad o afectación a los trabajadores mediante una herramienta subjetiva, tal como la matriz de cualificación o estimación del riesgo de la Guía Técnica Colombiana – 45 (GTC-45) guía para la identificación de los peligros y la valoración de los riesgos en seguridad y salud ocupacional. Dando como resultado una valoración de riesgos de Nivel II No Aceptable o Aceptable con control específico, Nivel III los cuales son Aceptables, y de Nivel IV Aceptable. Mediante la identificación de los peligros y la valoración de los riesgos se pudo determinar que las instalaciones del taller no cuentan con una señalética de seguridad, además existe un alto índice de riesgo de explosión e incendios, llevándome a desarrollar una matriz de objetivos y metas en la cual se estableció la propuesta y elaboración de un programa para la mitigación y control de los factores de riesgo en el Taller tales como: El plan de capacitación, plan de dotación de equipos de protección individual y ropa de trabajo, señalética y defensa contra incendios. Con la finalidad de salvaguardar la seguridad y salud de los servidores y en razón de haberse determinado niveles de riesgo III, II Y IV se recomienda que es indispensable que la propuesta de mejora contenida en este documento sea aprobada de forma inmediata por la máxima autoridad e implementada en el menor tiempo posible en el taller. | es_ES |
dc.description.abstract | The present research work refers to the Study of Management risks existing in the transport and workshop at Autonomous Government Municipal from Guano Canton. The project aims to preserve the integrity and health of human talent as well as physical facilities of national and international standards, using as methodology the Resolution N.C.D. 333, Chapter II, Art.9, numeral 2 at the Ecuadorian Social Security Institute (IESS), Technical Management. An analysis of the current situation was carried out in the following workstations: automobile mechanics, welding, electrician, storekeeper, light vehicle driver and truck operator, because these are more dangers. Using process maps as a tool to analyze the diferent types of activities which allowed to identify the risks in each areas and workstations, so it was determined the severity or impact to the workers through a subjective tool, such as the qualification or risk from the Colombia Technical Guide (GTC-45) guide to identify risks and the assessment of health and safety. The results are: Level II with not acceptable risks or acceptable with specific control, level III which are Acceptable, and level IV Acceptable. Through the identification and assessment of the risks were able todetermine that the facilities of the workstations do not have a safety signage, in addition there is a high risk of explosion and fire, leading to develop a matrix of objectives and goals which established the proposal and the development of a program in order to manage risk factors in the workstation such as: the training plan, a plan of personal protective equipment, working clothes, signage and fire defense. With the purpose to protec health and safety of workers, due to determined risk with II, III and IV levels, so it is recommended that this proposal can be approved immediately by the highest authority and implemented in the shortest posible time in the workstations. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Escuela Superior Politécnica de Chimborazo | es_ES |
dc.relation.ispartofseries | UDCTFM;85T00420 | - |
dc.rights | Info:eu-repo/semantics/openAccess | es_ES |
dc.subject | GESTIÓN DE RIESGOS | es_ES |
dc.subject | GUÍA TÉCNICA COLOMBIANA (GTC-45) | es_ES |
dc.subject | MITIGACIÓN | es_ES |
dc.subject | VALORACIÓN | es_ES |
dc.subject | TECNOLOGÍA DE LOS PROCESOS INDUSTRIALES | es_ES |
dc.subject | RIOBAMBA (CANTÓN) | es_ES |
dc.title | Estudio de la gestión de riesgos existentes en el taller del GAD Municipal del Cantón Guano. | es_ES |
dc.type | bachelorThesis | es_ES |
dc.contributor.miembrotribunal | Álvarez Pacheco, Carlos Oswaldo | - |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
Aparece en las colecciones: | Ingeniero Industrial |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
85T00420.pdf | 2,58 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons