Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/5061
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorSantillán Mariño, Carlos-
dc.contributor.authorArregui Toro, César Daniel-
dc.date.accessioned2016-07-22T15:50:11Z-
dc.date.available2016-07-22T15:50:11Z-
dc.date.issued2016-07-
dc.identifier.citationArregui Toro, César Daniel. (2016). Propuesta de un plan de mantenimiento empleando la ingeniería de la fiabilidad en base al análisis de la función tasa de fallos λ(t) aplicado al sistema de bombeo de reinyección de agua del Campo Auca Bloque 61 de la Empresa Petroamazonas EP. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/5061-
dc.descriptionActualmente los mercados petroleros son más competitivos y el petróleo debe extraerse al menor precio, para cumplir este requerimiento se debe contar con un sistema de bombeo de reinyección de agua que pueda mantener especificaciones técnicas durante un tiempo, esto dio origen al presente proyecto de investigación que tuvo como finalidad establecer la propuesta de un plan de mantenimiento empleando la ingeniería de la fiabilidad en base al análisis de la función tasa de fallos λ(t) aplicado al sistema de bombeo de reinyección de agua del campo Auca bloque 61 de la empresa Petroamazonas EP, ubicado en la provincia de Orellana. Anticipar y contener los fallos nos ayudarán a evitar sus causas y consecuencias para disminuir sus ocurrencias. La metodología utilizada fue una investigación de campo y bibliográfica documental se recopila los registros históricos de fallas de las unidades, estos datos y la ayuda del software Fiasoft sirvieron para establecer el modelo matemático estadístico y determinar los índices de fiabilidad. Con los resultados y los parámetros de fiabilidad obtenidos se propuso tareas para lograr optimizar el plan de mantenimiento y evitar que la fiabilidad del sistema sea inferior al 45% y disminuir la ocurrencia de las fallas lo que significa reducción de costos por mantenimientos correctivos y paros imprevistos, garantizando así la fiabilidad del sistema y los tiempos de disponibilidad de los equipos. Se recomienda dar estricto cumplimiento a la periodicidad de cada una de las tareas del plan de mantenimiento propuesto.es_ES
dc.description.abstractAt present oil markets are more competitive and oil must be extracted at the lowest Price. To meet this requirement it is necessary to have a water reinjection pumping system capable to keep technical specifications for some time, this led to this research project which purpose is to establish a proposed maintenance plan using reliability engineering based on the analysis of the rate function fault λ(t) applied to the water reinjection pumping system on Auca Field, Block 61 of the Petroamazonas EP company located in the province of Orellana. Foresee and contain break downs will help us to avoid the causes and consequences in order to prevent it from happening. The methodology used was a field research and literature documentary, a historical record of unit failures was compiled, these data and software support Fiasoft served to establish the statistical mathematical model and determine the reliability indices. With the results and reliability parameters obtained tasks are proposed in order to optimize the maintenance plan and prevent system reliability to be less than 45% and reduce the occurrence of faults which means costs reduce for corrective maintenance and unplanned shutdowns, ensuring this way system reliability and availability times of equipment. It is recommended to strictly comply with the frequency of each of the tasks proposed. It is recommended to strictly comply with the frequency of each of the tasks proposed in this maintenance plan.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTIPEC;20T00747-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectPLAN DE MANTENIMIENTOes_ES
dc.subjectFUNCIÓN TASA DE FALLOSes_ES
dc.subjectFIASOFT (SOFTWARE)es_ES
dc.subjectSISTEMA DE BOMBEO REINYECCIÓN DE AGUAes_ES
dc.subjectÍNDICES DE FIABILIDADes_ES
dc.subjectREGISTRO DE FALLOSes_ES
dc.subjectMODELO MATEMÁTICOes_ES
dc.titlePropuesta de un plan de mantenimiento empleando la ingeniería de la fiabilidad en base al análisis de la función tasa de fallos λ(t) aplicado al sistema de bombeo de reinyección de agua del Campo Auca Bloque 61 de la Empresa Petroamazonas EPes_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.contributor.miembrotribunalFreire Miranda, Jorge-
dc.contributor.miembrotribunalAstudillo Machuca, César-
dc.rights.urihttps://creativecommons.org.//licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Maestrias: Modalidad Proyectos de Investigación y Desarrollo

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
20T00747.pdf7,95 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons