Por favor, use este identificador para citar o enlazar este ítem:
http://dspace.espoch.edu.ec/handle/123456789/4906
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Remache García, Henry | - |
dc.contributor.author | Rivadeneira Ortega, Jéssica Johana | - |
dc.date.accessioned | 2016-06-15T14:21:42Z | - |
dc.date.available | 2016-06-15T14:21:42Z | - |
dc.date.issued | 2015 | - |
dc.identifier.citation | Rivadeneira Ortega, Jéssica Johana. (2015). Explotación de caliza a cielo abierto de la concesión minera "Gretha Piedad". Escuela Superior Politécnica de Chimborazo. Riobamba | es_ES |
dc.identifier.uri | http://dspace.espoch.edu.ec/handle/123456789/4906 | - |
dc.description | La presente investigación propone: evaluar el yacimiento de caliza denominada Gretha Piedad perteneciente a la Unión Cementera Nacional UCEM C.E.M; utilizar el método de explotación a cielo abierto mediante banco descendentes para la elaboración del cemento Portland, ubicado en la provincia de Morona Santiago, cantón Méndez, sector de Yucal. Que consta de dos partes, el cálculo de reservas del bloque de estudio y su diseño de explotación de caliza por bancos descendentes, mediante operaciones de arranque, carga y transporte de la explotación del yacimiento de caliza mediante un dimensionamiento adecuado de la maquinaria. Este proyecto tiene una planificación minera para 5 años con un plan de explotación a largo plazo de las reservas de la cantera, se han diseñado 13 niveles de explotación con una altura de 10 metros cada uno. Aplicado en el cálculo de reservas mediante la ejecución de perfiles geológicos del área mineralizada por el método de las isolíneas, con una dirección de suroeste-noreste (los perfiles A-A’, B-B’, C-C’, D-D’ ) y de noroeste-sureste ( los perfiles E-E’, F-F’, G-G’, H-H’) para alcanzar mayor longitud, que permitiría una mayor visualización de la geometría del bloque calcáreo, confirmándose las reservas probadas de 52’565.108,2 toneladas de caliza, la cual requirió realizar un cálculo de explosivos necesarios para la explotación de caliza. Se concluye que la producción de la cantera será de 21818,2 toneladas/mes, con un costo de beneficio de explotación de una tonelada es: 4,43 dólares/ ton. Recomendando realizar una explotación selectiva con la instalación de un laboratorio, ejecutando un muestreo y análisis químico en cada banco a perforarse, para una óptima producción de caliza, para evitar diluciones de mineral. | es_ES |
dc.description.abstract | This research aims to evaluate the limestone deposit, called Gretha Piedad belonging to the National Unión Cement, UCEM CEM use the method of exploitation by open pit descending bank to the development of Portland cement, located in the province of Morona Santiago Mendez canton Yucal sector. Consisting of two parts, calculation of reserves, of the study block and its design of exploitation of limestone for banks falling by starting operations, loading and transport of the exploitation of limestone deposit through proper sizing of the machinery. This project has a mine planning for 5 years with a plan for long/ term exploitation of the reserves of the quarry, were designed 13 operating levels with a height of meters each. Applied in the calculation of reserves by running geological profiles, the mineralized area, bythe method of isolines, with a southwest-northeast direction (A-A’, B-B’, C-C’, D-D’ profiles) and northwest-southeast (E-E’, F-F’, G-G’, H-H’ profiles) for achieving greater length, would permit greater viewing geometry limestone block, confirming proved reserves, 52’565.108,2 tons of limestone, which required a calculation of explosives required for, exploitation of limestone. It is concluded that the production of the quarry will be 21,818.2 tons/ month; costing operating profit one ton is 4.43 U.S. dollars/ton. Recommending perform a selective operation with the installation of a laboratory performing sampling and chemical analysis in each bank to be drilled for optimum limestone production, to avoid dilution of mineral. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Escuela Superior Politécnica de Chimborazo | es_ES |
dc.relation.ispartofseries | UDCTFRN;53T00008 | - |
dc.subject | EXPLOTACIÓN DE CALIZA | es_ES |
dc.subject | EXPLOTACIÓN A CIELO ABIERTO | es_ES |
dc.subject | CONCESIÓN MINERA GRETHA PIEDAD | es_ES |
dc.subject | SANTIAGO DE MÉNDEZ (PARROQUIA) | es_ES |
dc.subject | SANTIAGO (CANTÓN) | es_ES |
dc.subject | MORONA SANTIAGO (PROVINCIA) | es_ES |
dc.title | Explotación de caliza a cielo abierto de la concesión minera "Gretha Piedad" | es_ES |
dc.type | bachelorThesis | es_ES |
dc.contributor.miembrotribunal | Pino Loza, Iván Arturo | - |
Aparece en las colecciones: | Ingeniería en Geología y Minas |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
53T00008. pdf | 6,73 MB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.