Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/21741
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCuesta Andrade, Gregory Guillermo-
dc.contributor.authorValverde Villavicencio, José Damián-
dc.contributor.authorJaramillo Villa, Andrés Fernando-
dc.date.accessioned2024-06-24T15:22:07Z-
dc.date.available2024-06-24T15:22:07Z-
dc.date.issued2023-11-27-
dc.identifier.citationValverde Villavicencio, José Damián; Jaramillo Villa, Andrés Fernando. (2023). Análisis de costo/beneficio utilizando la metodologia de absorción aplicada en la mina ¨Nuevo Amanecer¨ perteneciente a la concesión San Sebastian II ubicada en el sector Rio Villa, cantón Camilo Ponce Enriquez, provincia del Azuay. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/21741-
dc.descriptionLa zona de estudio presenta diversas problemáticas relacionadas con la distribución de la mineralización en el área, como el agotamiento de las reservas, lo que conlleva a problemas técnicos y económicos. Entre estos se incluye la reducción en la producción, costos disminuidos, inversiones inactivas y explotación desordenada. Además, la falta de planificación estratégica agrava la situación. El objetivo de esta investigación fue analizar el costo/beneficio de productividad aplicando la metodología de absorción. Para ello, se realizó un análisis detallado de los costos incurridos en cada etapa del ciclo de trabajo minero, incluyendo exploración, preparación del terreno, extracción, procesamiento y transporte. Asimismo, se consideraron labores auxiliares como mantenimiento de equipos, seguridad e insumos en general. Los resultados más relevantes revelaron una producción total de 5400 Toneladas Métricas Secas (TMS), con un beneficio promedio estimado de USD 1,080,000 dólares estadounidenses durante el periodo de estudio. Después de restar los gastos de producción, se obtuvo un beneficio económico de USD 957 061.91 dólares estadounidenses. Además, se identificaron factores críticos que impactaron directamente en los costos de producción, como la automatización y el mantenimiento preventivo de equipos e instalaciones. Se concluye que el proyecto demostró eficiencia de las operaciones en la mina Nuevo Amanecer de la concesión San Sebastián II, a través de la mecanización y optimización, contribuyendo a una estabilidad operativa y menor costo de producción, es así que se recomienda realizar análisis periódicos de los beneficios económicos obtenidos durante el ciclo operativo minero y evaluar su impacto para la sostenibilidad y rentabilidad del proyecto minero.es_ES
dc.description.abstractThe study area presents several problems regarding the distribution of mineralization in the area, such as the depletion of reserves, which leads to technical and economic issues. These include the reduction in production, reduced costs, inactive investments, and disorderly exploitation. Moreover, the lack of strategic planning aggravates the situation. This research aimed to analyze the cost/benefit of productivity by applying the absorption methodology. For this purpose, a detailed analysis of the costs incurred at each stage of the mining work cycle was carried out, including exploration, land preparation, extraction, processing, and transport. Likewise, auxiliary tasks such as equipment maintenance, safety and general inputs were considered. The most relevant results revealed a total production of 5 400 Dry Metric Tonnes (TMS), with an estimated average profit of USD 1,080,000 US dollars during research. By subtracting manufacturing costs, derived a financial benefit about USD 957 061.91 US dollars. In addition, critical factors were identified that directly impacted production costs, such as automation and preventive maintenance of equipment and facilities. In conclusion, the project turned out to be efficient regarding operations in Nuevo Amanecer mine of San Sebastian II concession, through mechanization and optimization, contributing to operational stability and lower cost of production. Thus, it is recommended to carry out periodic analysis of the economic benefits obtained during the mining operating cycle and evaluate its impact on the sustainability and profitability of the mining project.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFRN;53T0081-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectMINERÍA SUBTERRÁNEAes_ES
dc.subjectCOSTO UNITARIOes_ES
dc.subjectBENEFICIOes_ES
dc.subjectMÉTODO DE ABSORCIÓNes_ES
dc.subjectCONTABILIDAD DE COSTOSes_ES
dc.subjectCICLOS DE EXTRACCIÓNes_ES
dc.subjectANALISIS DE COSTOSes_ES
dc.titleAnálisis de costo/beneficio utilizando la metodologia de absorción aplicada en la mina ¨Nuevo Amanecer¨ perteneciente a la concesión San Sebastian II ubicada en el sector Rio Villa, cantón Camilo Ponce Enriquez, provincia del Azuayes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalToalombo Vargas, Víctor Miguel-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniería en Geología y Minas

Ficheros en este ítem: