Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/19213
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorVillacrés Parra, Sergio Raúl-
dc.contributor.authorAldaz Calero, Jonathan Alexander-
dc.date.accessioned2023-08-07T16:58:06Z-
dc.date.available2023-08-07T16:58:06Z-
dc.date.issued2023-05-11-
dc.identifier.citationAldaz Calero, Jonathan Alexander. (2023). Elaboración de un plan de mantenimiento basado en la condición para equipos críticos de la planta de pintura en la Empresa CIAUTO Cía. Ltda. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/19213-
dc.descriptionEl presente Trabajo de Integración Curricular tuvo como objetivo elaborar un plan de mantenimiento basado en la condición de los equipos críticos de la planta de pintura en la empresa CIAUTO Cia.Ltda. Inició con la evaluación de la gestión del mantenimiento utilizando la técnica de evaluación de gestión de activos, fiabilidad operacional y mantenimiento (AMORMS). Posteriormente, se actualizó el inventario técnico de los activos a mantener y se aplicó el análisis de criticidad para determinar los sistemas críticos. A estos sistemas se les aplicó la metodología de mantenimiento centrado en la confiabilidad (RCM), con el fin de obtener información y documentación necesaria que ayuden a reducir o mitigar las consecuencias de falla. A partir de la información recopilada, se realizó un Análisis de Síntomas y Modos de Falla (FMSA), obteniendo el Número de Priorización de Monitoreo (MPN). Este análisis condujo a la elección del análisis de vibración como el método más importante de monitoreo. Además, mediante una encuesta realizada se determinaron los criterios de mejora dentro de la gestión del mantenimiento. Con el análisis de criticidad, se identificaron 58 equipos de alta criticidad. De estos, se seleccionaron 40 sistemas para ser sometidos a un monitoreo de condición. Como resultado, se generaron 231 tareas de mantenimiento basado en condición, con el objetivo de mejorar la planificación, programación y ejecución de tareas de mantenimiento preventivo, y consolidar una alta disponibilidad. Se recomienda la adquisición de un software de logística de mantenimiento para optimizar la gestión de la información. En conclusión, un plan de mantenimiento basado en la condición ayuda a lograr los objetivos de la organización y mejora la eficiencia de la gestión del mantenimiento.es_ES
dc.description.abstractThis Curricular Integration Project aims to develop a maintenance plan based on the condition of critical equipment in the painting plant of CIAUTO Cia.Ltda. It began with the evaluation of maintenance management using the Asset Management, Operational Reliability, and Maintenance Evaluation technique (AMORMS). Subsequently, the technical inventory of the assets to be maintained was updated, and a critical analysis was applied to determine the critical systems. The reliability-centered maintenance (RCM) methodology was applied to these systems to obtain the necessary information and documentation and help reduce or mitigate the consequences of failure. A Failure Modes and Symptoms Analysis (FMSA) was conducted based on the collected data, obtaining the Monitoring Priority Number (MPN). This analysis led to the selection of vibration analysis as the most critical monitoring method. Additionally, improvement criteria within the maintenance management were determined through a survey. By conducting the criticality analysis, 58 highly critical equipment were identified. Out of these, 40 systems were selected for condition monitoring. As a result, 231 condition-based maintenance tasks were generated to improve the planning, scheduling, and execution of preventive maintenance tasks and ensure high availability. It is recommended to acquire maintenance logistics software to optimize information management. In conclusion, a condition-based maintenance plan helps achieve organizational objectives and improves maintenance management efficiency.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;25T00524-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectPLAN DE MANTENIMIENTOes_ES
dc.subjectEQUIPOS CRÍTICOSes_ES
dc.subjectGESTIÓN DE MANTENIMIENTOes_ES
dc.subjectANÁLISIS DE CRITICIDADes_ES
dc.subjectMANTENIMIENTO CENTRADO EN LA CONFIABILIDAD (RCM)es_ES
dc.subjectANALISIS DE SINTOMAS Y MODOS DE FALLA (FMSA)es_ES
dc.titleElaboración de un plan de mantenimiento basado en la condición para equipos críticos de la planta de pintura en la Empresa CIAUTO Cía. Ltdaes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalGallegos Londoño, César Marcelo-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero de Mantenimiento; Ingeniero/a en Mantenimiento Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
25T00524.pdf2,27 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons