Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/19210
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorAstudillo Machuca, César Eduardo-
dc.contributor.authorCaizaguano Colcha, Alexis Joel-
dc.contributor.authorCisneros Caicedo, Johana Lisbeth-
dc.date.accessioned2023-08-07T16:37:20Z-
dc.date.available2023-08-07T16:37:20Z-
dc.date.issued2021-08-27-
dc.identifier.citationCaizaguano Colcha, Alexis Joel; Cisneros Caicedo, Johana Lisbeth. (2021). Optimización energética de los transformadores de la Escuela Superior Politécnica de Chimborazo y delimitación de sus centros de carga. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/19210-
dc.descriptionEl análisis energético de dos transformadores de la Facultad de Mecánica pertenecientes a los edificios del Laboratorio-Decanato y el edificio de aulas de la Carrera de Mantenimiento Industrial se ejecutó con el propósito de determinar cuál debería ser la capacidad real de dichos transformadores en función del consumo eléctrico, y analizar la calidad de energía que es suministrada por la red eléctrica, examinando las posibles anomalías eléctricas estando los edificios en su carga máxima de consumo eléctrico. Se realizó la conexión del analizador Fluke, por un tiempo estimado de siete días laborables, la información se almacenaba cada quince minutos. Por medio de la asistencia del software Power-log se descargó la información histórica del equipo para su posterior análisis a través de normas y resoluciones del Ministerio de Energías y Recursos Naturales No Renovables, para determinar la eficiencia de los transformadores de distribución además ayudan a determinar la capacidad óptima de consumo de cada edificio. Una vez recopilados los datos de los dos edificios se realizaron cálculos y por medio de la interpretación de las gráficas del analizador Fluke se conoció la potencia real de consumo de cada edificio. Se determinó que las lecturas llegan a un voltaje de 130,09 V, sin embargo, los cálculos arrojan que el voltaje recomendable que se debe suministrar al edificio de la Carrera de Mantenimiento Industrial es de 127V. La potencia del transformador instalada en el edificio de Mantenimiento es de 50kVA, por medio de cálculos se determinó que la potencia real de consumo es de 21.55 kVA encontrándose sobredimensionado en un 28,45kVA, mientras que la potencia del transformador del edificio de laboratorio-decanato se encuentra en un rango tolerable. Por lo tanto, se recomienda que, para la próxima toma de datos se utilice el equipo de protección personal adecuado para realizar la conexión del analizador.es_ES
dc.description.abstractThe energy analysis of two transformers of Mechanics Faculty belonging to the buildings of the Laboratory-Dean's Office and the classroom building of the Industrial Maintenance Career was carried out to determine the actual capacity of the transformers based on electricity consumption and analyze the quality of energy that is supplied by the electrical network, examining possible electrical anomalies while the buildings are at their maximum electrical consumption load. The Fluke analyzer was connected for an estimated seven working days, and the information was stored every fifteen minutes. Through the Power-log software's assistance, the equipment's historical data was downloaded for its subsequent analysis through regulations and resolutions of the Ministry of Energy and Non-Renewable Natural Resources to determine the efficiency of the distribution transformers. They also helped to determine the optimal consumption capacity of each building. Once the data from the two buildings were collected, the calculations were made, and through the interpretation of the Fluke analyzer graphs, the real power consumption of each building was known. It was determined that the readings reached a voltage of 130.09 V; however, the recommended calculations voltage that must be supplied to the Industrial Maintenance Career building is 127V. The power of the transformer installed in the Maintenance building is 50kVA, through calculations it was determined that the actual consumption power is 21.55 kVA, being oversized by 28.45kVA, while the power of the transformer in the Laboratory-deanery building is in a tolerable range. Therefore, it is recommended the appropriate personal protective equipment be used for the next data collection to connect the analyzer.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;25T00521-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectANÁLISIS ENERGÉTICOes_ES
dc.subjectTRANSFORMADORes_ES
dc.subjectCONSUMO ELÉCTRICOes_ES
dc.subjectCALIDAD DE ENERGÍAes_ES
dc.subjectRED ELÉCTRICAes_ES
dc.subjectPOTENCIA INSTALADAes_ES
dc.titleOptimización energética de los transformadores de la Escuela Superior Politécnica de Chimborazo y delimitación de sus centros de cargaes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalSantillán Gallegos, Marco Heriberto-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero de Mantenimiento; Ingeniero/a en Mantenimiento Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
25T00521.pdf5,52 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons