Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/15777
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorÁlvarez Pacheco, Carlos Oswaldo-
dc.contributor.authorBautista Tonato, Darwin Vladimir-
dc.date.accessioned2022-06-08T22:35:04Z-
dc.date.available2022-06-08T22:35:04Z-
dc.date.issued2021-03-16-
dc.identifier.citationBautista Tonato, Darwin Vladimir. (2021). Elaboración de un plan integral de gestión de riesgos e implementación de señalética para el edificio principal y el teatro municipal, pertenecientes al Gobierno Autónomo Descentralizado Municipal del cantón Santiago de Píllaro. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/15777-
dc.descriptionEl presente trabajo de titulación trata sobre la elaboración de un Plan de Gestión de Riesgos e implementación de señalética en el edificio principal y teatro del GADM Santiago de Píllaro. A través de un estudio técnico de riesgo se elaboró la propuesta siguiendo el modelo establecido por la Secretaria de Gestión de Riesgos (SGR), permitiendo fomentar una nueva cultura, desde todos los sectores de la sociedad, para la reducción de emergencias y desastres. Para la elaboración de dicho plan se obtuvo el nivel de riesgo obtenido frente amenazas naturales con un 66,6%; el riesgo de incendio para el edificio principal y teatro por el método Meseri fue leve y aceptable respectivamente; en cuanto a los riesgos se determinó las medidas de control con estimación de 14 riesgos moderados que se vio en cada una de las instalaciones del GADM Santiago de Píllaro los cuales son: 3 riesgos físicos, 5 riesgos ergonómicos, 6 riesgos psicosociales, todos los riesgos valorados por el Método de Identificación y Evaluación de Riesgos Laborales INSHT. Finalmente se implementó señalética de seguridad mediante la normativa ISO NTE INEN 2239:2014, la cinta antideslizante ubicado en las gradas de la institución, los mapas de riesgo, NFPA 10 (extintores portátiles contra incendios), el sistema de alerta temprana bajo la NFPA72 (códigos de alarma contra incendios) en el edificio principal, Se concluye que en cada una de las fases que contempla el PIGR es superior al 80 %, por lo que la gestión de riesgos es eficaz. Se recomienda realizar la evaluación y el seguimiento a través de las capacitaciones y simulacros del PIGR.es_ES
dc.description.abstractThis thesis deals with the elaboration of a Risk Management Plan and the implementation of signage in the main building and theater of the GADM Santiago de Píllaro. Through a technical risk study, the proposal was elaborated following the model established by the Secretary of Risk Management (SGR), allowing the promotion of a new culture, from all sectors of society, for the reduction of emergencies and disasters. For the development of this plan, the risk level obtained for natural hazards was 66.6%; the fire risk for the main building and theater by the Meseri method was slight and acceptable respectively; as for the risks, control measures were determined with an estimate of 14 moderate risks that were seen in each of the facilities of the GADM Santiago de Píllaro, which are: 3 physical risks, 5 ergonomic risks, 6 psychosocial risks, all risks assessed by the Method of Identification and Evaluation of Occupational Risks INSHT. Finally, safety signage was implemented using ISO NTE INEN 2239:2014, the anti-slip tape located on the institution's bleachers, risk maps, NFPA 10 (portable fire extinguishers), the early warning system under NFPA72 (fire alarm codes) in the main building, It is concluded that in each of the phases contemplated by the PIGR is higher than 80%, so risk management is effective. It is recommended to perform the evaluation and follow-up through PIGR training and drills.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;85T00619-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectTECNOLOGÍA Y CIENCIAS DE LA INGENIERÍAes_ES
dc.subjectPLAN INTEGRAL DE GESTIÓN DE RIESGOS (PIGR)es_ES
dc.subjectSEÑALETICAes_ES
dc.subjectMÉTODO MESERIes_ES
dc.subjectMAPA DE RIESGOSes_ES
dc.titleElaboración de un plan integral de gestión de riesgos e implementación de señalética para el edificio principal y el teatro municipal, pertenecientes al Gobierno Autónomo Descentralizado Municipal del cantón Santiago de Píllaroes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalCayán Martínez, Juan Carlos-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
85T00619.pdf7,83 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons