Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/9848
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorViscaíno Cuzco, Mayra Alexandra-
dc.contributor.authorMoyón Moyón, Carmen Del Rocio-
dc.contributor.authorRuiz Constante, Gabriela Nataly-
dc.date.accessioned2019-03-13T20:49:39Z-
dc.date.available2019-03-13T20:49:39Z-
dc.date.issued2018-10-19-
dc.identifier.citationMoyón Moyón, Carmen Del Rocio; Ruiz Constante, Gabriela Nataly. (2018). Desarrollo del plan de mantenimiento para el auditorio, taller de máquinas herramientas, edificio del decanato de la Facultad de Mecánica y Moduláres carrera de Ingeniería Industrial-ESPOCH aplicando metodología (RCM). Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/9848-
dc.descriptionUna buena gestión de mantenimiento, ayudará a preservar y conservar la infraestructura civil, de los equipos eléctricos y mecánicos de los laboratorios. Desarrollar un plan de mantenimiento para Taller de Máquinas Herramientas, Edificio Decanato-Facultad de Mecánica, Modulares Carrera de Ingeniería Industrial-ESPOCH y auditorio, aplicando la metodología RCM. Para cumplir con éste objetivo, se desarrollaron tres fases: la evaluación de la gestión de mantenimiento de infraestructura, al Departamento de Mantenimiento y Desarrollo Físico (DMDF), para lo cual se empleó el método Proceso Analítico Jerárquico (AHP). En la segunda fase, se desarrolló el plan de mantenimiento, para el cual se realizó el inventario técnico de la infraestructura civil y de los equipos de laboratorios, a cada ítem inventariado se le estableció un código el cual puede ser alfanumérico y numérico. Además, se realizó el análisis de criticidad de cada uno de los equipos, como resultado de este análisis se definió como equipo crítico en la parte civil al ascensor y del taller a los tornos. Para éstos equipos se establecieron modelos de mantenimiento, que ayudarán a llevar a cabo la gestión de mantenimiento mejorando la disponibilidad de los equipos. Finalmente se establecieron tareas para cada equipo, con frecuencias de ejecución y personal especializado a cargo de la actividad. En la tercera fase se capacitó al personal de la ESPOCH a cargo de la infraestructura civil como es el DMDF y a los técnicos docentes a cargo de los equipos de laboratorios, de manera personalizada acerca del manejo del software de mantenimiento empleado. Se concluye que en la evaluación realizada, seis laboratorios tienen un nivel deficiente y uno cumple con un rendimiento adecuado de la gestión de mantenimiento por lo que se recomienda la implementación del plan de mantenimiento para la preservación y mejor funcionamiento de los equipos.es_ES
dc.description.abstractAn adequate maintenance management will help to preserve and conserve the civilian infrastructure of the electrical and mechanical laboratories equipment, besides to develop a maintenance plan for “Machine Tools Workshop, Deanship Building-Mechanical Engineering Faculty, Industrial Engineering Career building-ESPOCH and auditorium though the application of the RCM methodology. To fulfill this objective, it developed three phases: the infrastructure maintenance management evaluation to the Department of Maintenance and Physical Development (DMDF) for which the Hierarchical Analytical Process (AHP) method was used. In the second phase, it developed the maintenance plan by making the technical inventory of the civilian infrastructure and the laboratory equipment by establishing a code for each inventoried item, which can be alphanumeric and numerical. In addition, the criticality analysis of each of the equipment was carried out and as a result of this analysis, establishing as critical equipment, the elevator as well as the lathes workshop. For this equipment, it established maintenance models that will help to carry out maintenance management, improving the availability of the equipment. Finally, some tasks were established for each one of the equipment with frequencies execution and taking into account specialized personnel in charge of the activity. In the third phase, the ESPOCH staff in charge of the civilian infrastructure, such as: the DMDF and the teacher staff in charge of the laboratory equipment were trained in a personalized way about the maintenance software management. It is concluded that according to the evaluation carried out: six laboratories have a deficient level, but one has an adequate performance about maintenance management that is why, it is recommended the implementation of the maintenance plan for the preservation and better functioning of the equipment.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;25T00334-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectTECNOLOGÍA Y CIENCIAS DE LA INGENIERÍAes_ES
dc.subjectINGENIERÍA DEL MANTENIMIENTOes_ES
dc.subjectGESTIÓN DE MANTENIMIENTOes_ES
dc.subjectANALYTIC HIERARCHY PROCESS (AHP)es_ES
dc.subjectINVENTARIO TÉCNICOes_ES
dc.subjectANÁLISIS DE CRITICIDADes_ES
dc.subjectPLAN DE MANTENIMIENTO PREVENTIVOes_ES
dc.subjectMANTENIMIENTO ASISTIDO POR ORDENADORes_ES
dc.titleDesarrollo del plan de mantenimiento para el auditorio, taller de máquinas herramientas, edificio del decanato de la Facultad de Mecánica y Moduláres carrera de Ingeniería Industrial-ESPOCH aplicando metodología (RCM).es_ES
dc.typebachelorThesises_ES
dc.contributor.miembrotribunalNuela Sevilla, Stalin Eduardo-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero de Mantenimiento; Ingeniero/a en Mantenimiento Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
25T00334.pdf4,08 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons