Por favor, use este identificador para citar o enlazar este ítem:
http://dspace.espoch.edu.ec/handle/123456789/7526
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Abad Apuango, Juan Carlos | - |
dc.contributor.author | Togra Aguilar, Edmundo Fernando | - |
dc.date.accessioned | 2017-11-10T15:20:04Z | - |
dc.date.available | 2017-11-10T15:20:04Z | - |
dc.date.issued | 2017-10 | - |
dc.identifier.citation | Abad Apuango, Juan Carlos. (2017). Optimización del plan de mantenimiento mecánico para el mejoramiento de la disponibilidad del Sistema Oleo Hidráulico en las unidades de generación Fase AB en la Central Hidroeléctrica Paute Molino. Escuela Superior Politécnica de Chimborazo. Riobamba. | es_ES |
dc.identifier.uri | http://dspace.espoch.edu.ec/handle/123456789/7526 | - |
dc.description | La gran demanda de energía eléctrica en el país, obliga a mantener la disponibilidad permanente de todas las unidades de generación de la Central Hidroeléctrica Paute Molino. Existen demasiadas intervenciones preventivas que provocan indisponibilidad de las unidades de generación, este proyecto propuso una mejora en la optimización del plan de mantenimiento mecánico para el mejoramiento de la disponibilidad del Sistema Oleo hidráulico en las unidades de generación de la Fase AB, basado en su historial, recopilación de información de los manuales del fabricante, fallos de los equipos, incidencias y acciones de mantenimiento, también para lo cual se empleó estrategias de auditoria de gestión de mantenimiento, diagrama de Pareto y técnicas del mantenimiento predictivo. Para la toma de información que sirvió para este análisis, se consideraron los resultados de reportes e informes técnicos de pruebas realizadas a los activos objeto del presente estudio. Los hallazgos de la auditoría determinaron debilidades y los resultados obtenidos fueron alineados al objetivo general de optimización del plan de Mantenimiento Mecánico y permitió el incremento de la disponibilidad. Se concluyó con el planteamiento de la disminución del tiempo en la ejecución de los mantenimientos preventivos, eliminación del mantenimiento bimestral y mejora del plan de mantenimiento predictivo y monitoreo en línea de la condición de los equipos. Se recomienda implementar esta propuesta. | es_ES |
dc.description.abstract | The high demand for electrical energy in the country, requires maintaining the permanent availability of all the generation units of the Paute Molino Hydroelectric Power Plant. There are too many preventive interventions that cause unavailability of the generation units, this project proposed an improvement in the optimization of the mechanical maintenance plan for the improvement of the availability of the Eolic Hydraulic System in the generation units of the Phase AB, based on its history, compilation of information from the manufacturer’s manuals, equipment failures, incidents and maintenance actions, also for which maintenance management audit strategies, Pareto diagram and predictive maintenance techniques were used. For the information that served for this analysis, the results of reports and technical reports of tests performed on the assets of the present study were considered. The audit findings determined weaknesses and the results obtained were aligned to the general objective of optimization of the Mechanical Maintenance plan and allowed the increase of the availability. It concluded with the approach of reducing the time in the execution of the preventive maintenance, elimination of bimonthly maintenance and improvement of the plan of predictive maintenance and online monitoring of the condition of the equipment. It is recommended to implement the proposal. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Escuela Superior Politécnica de Chimborazo | es_ES |
dc.relation.ispartofseries | UDCTIPEC;20T00906 | - |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.subject | TECNOLOGÍA Y CIENCIAS DE LA INGENIERÍA | es_ES |
dc.subject | INGENIERÍA EN MANTENIMIENTO | es_ES |
dc.subject | DISPONIBILIDAD | es_ES |
dc.subject | OPTIMIZACIÓN DEL PROCESO | es_ES |
dc.subject | OLEO HIDRÁULICO | es_ES |
dc.subject | MANTENIMIENTO PREDICTIVO | es_ES |
dc.title | Optimización del plan de mantenimiento mecánico para el mejoramiento de la disponibilidad del Sistema Oleo Hidráulico en las unidades de generación Fase AB en la Central Hidroeléctrica Paute Molino. | es_ES |
dc.type | info:eu-repo/semantics/masterThesis | es_ES |
dc.contributor.miembrotribunal | Córdova Ordóñez, Luis Giovanny | - |
dc.contributor.miembrotribunal | Callay Pancho, Carlos Rafael | - |
dc.rights.uri | https://creativecommons.org.//licenses/by-nc-sa/3.0/ec/ | es_ES |
Aparece en las colecciones: | Maestrias: Modalidad Proyectos de Investigación y Desarrollo |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
20T00906.pdf | 6,39 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons