Por favor, use este identificador para citar o enlazar este ítem:
http://dspace.espoch.edu.ec/handle/123456789/6230
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Santillán Gallegos, Marco Heriberto | - |
dc.contributor.author | Tayupanta Albán, William Fernando | - |
dc.date.accessioned | 2017-04-24T16:06:35Z | - |
dc.date.available | 2017-04-24T16:06:35Z | - |
dc.date.issued | 2017-03 | - |
dc.identifier.citation | Gestión del mantenimiento de cables subterráneos de media tensión en el sistema eléctrico del Bloque 31 operado por Petroamazonas EP. Escuela Superior Politécnica de Chimborazo. Riobamba. | es_ES |
dc.identifier.uri | http://dspace.espoch.edu.ec/handle/123456789/6230 | - |
dc.description | El proyecto Gestión del Mantenimiento de cables Subterráneos de Media Tensión en el Sistema Eléctrico del Bloque 31, se desarrolló en la provincia de Orellana, cantón Aguarico. El estudio tiene como base un enfoque del tipo exploratorio y alcanza un nivel descriptivo. Considera como punto de partida que los sistemas de cableado subterráneo se utilizan para la distribución de energía eléctrica en la mayoría de campos de producción petrolera, por ello resulta importante gestionar su mantenimiento de forma eficiente prolongando su tiempo de vida útil, sin afectar el ecosistema que lo rodea y siempre pensando en la seguridad del personal. Empieza con la investigación y clasificación de técnicas preventivas y predictivas existentes en nuestro medio. Se consideran herramientas como la auditoria interna y la encuesta para poder determinar la condición actual del mantenimiento obteniendo un nivel del 43% de efectividad que se considera inaceptable. Se evalúa el impacto que tendría una falla en el sistema eléctrico subterráneo y se plantean alternativas para gestionar su mantenimiento por medio de un plan de mantenimiento detallado y en lazo secuencial cerrado. Luego de la implementación del modelo de gestión se logra incrementar la efectividad hasta un nivel de 78.95%. Se logró incrementar el índice de confiabilidad del sistema desde el 47,4% inicial hasta el 78,1% actual. Se puede concluir que estos niveles obtenidos tanto en la efectividad del mantenimiento como en la confiabilidad del sistema actualmente son aceptables pero se recomienda continuar con el proceso de mejoramiento continuo y monitorear permanentemente los indicadores descritos en este modelo de gestión. | es_ES |
dc.description.abstract | The medium-voltage underground cable maintenance management system in Block 31, was developed in Orellana province, Aguarico canton. This investigation was exploratory and descriptive. We know this system is used to distribute electrical energy in the most of oil enterprises, that is why it is important to manage its maintenance efficiently to extend its lifespan without affecting the surroundings and to ensure the staff. In this investigation, we used preventive and predictive techniques of our environment. Internal audit and survey were also considered to determine the current maintenance situation. A level of effectiveness of 43% was gotten, but it was no acceptable. The impact of a failure in the system was evaluated. Some alternatives were set out to manage its maintenance by means of a maintenance plan and in closed loop system. After implementing the management model, effectiveness increased up to 78.95%. Reliability also increased from 47.4% up to 78.1%. It is concluded that these results are acceptable. It is recommended to continue with the improvement process and to monitor the indicators proposed in this investigation permanently. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Escuela Superior Politécnica de Chimborazo | es_ES |
dc.relation.ispartofseries | UDCTIPEC;20T00822 | - |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.subject | TECNOLOGÍA Y CIENCIAS DE LA INGENIERÍA | es_ES |
dc.subject | GESTIÓN DE MANTENIMIENTO | es_ES |
dc.subject | SISTEMA ELÉCTRICO | es_ES |
dc.subject | PLAN DE MANTENIMIENTO | es_ES |
dc.subject | MEJORAMIENTO CONTINUO | es_ES |
dc.subject | INGENIERÍA EN MANTENIMIENTO | es_ES |
dc.subject | ORELLANA (PROVINCIA) | es_ES |
dc.title | Gestión del mantenimiento de cables subterráneos de media tensión en el sistema eléctrico del Bloque 31 operado por Petroamazonas EP. | es_ES |
dc.type | info:eu-repo/semantics/masterThesis | es_ES |
dc.contributor.miembrotribunal | Paucar Estrada, Hernán Edelberto | - |
dc.contributor.miembrotribunal | Freire Miranda, Jorge Estuardo | - |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
Aparece en las colecciones: | Maestrias: Modalidad Proyectos de Investigación y Desarrollo |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
20T00822.pdf | 4,05 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons