Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/5557
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorLogroño Logroño, María Isabel-
dc.contributor.authorChoca Socoy, Maricela-
dc.contributor.authorRodríguez Balseca, Mercy Guadalupe-
dc.date.accessioned2016-12-12T18:23:14Z-
dc.date.available2016-12-12T18:23:14Z-
dc.date.issued2015-
dc.identifier.citationChoca Socoy, Maricela; Rodríguez Balseca, Mercy Guadalupe. (2015). Auditoría integral al proyecto “Creciendo con Nuestros Wawas” del Gobierno Autónomo Descentralizado de la provincia de Chimborazo de la ciudad de Riobamba, período 2013. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/5557-
dc.descriptionLa presente tesis contiene una Auditoría Integral al Proyecto “Creciendo con Nuestros Wawas” del Gobierno Autónomo Descentralizado de la Provincia de Chimborazo de la ciudad de Riobamba, periodo 2013. Donde se evaluó el grado de eficiencia, eficacia, economía, ecología, equidad y ética con el que se maneja los recursos existentes y el desempeño del personal, logrando así el cumplimiento de los objetivos y metas establecidas Evaluamos la estructura del Control Interno establecida por el programa utilizando el método COSO II en la extensión en la cual consideramos necesaria para determinar la naturaleza, oportunidad y extensión de los procedimientos de auditoria necesarios para expresar una opinión de dichos estados. Para lograr el propósito fue necesario profundizar la teoría que relacionó al objeto de estudio, por ello se hace referencia a; Normas Internacionales de Contabilidad promulgadas por IFAC y con los requisitos del respectivo Convenio con el Banco Mundial, conceptualización de Auditoría Integral, Evaluación del Sistema de Control Interno, Papeles de Trabajo, Desarrollo de Hallazgos y Redacción de Informe y Comunicación de Resultados; métodos de auditoría como cuestionarios, entrevistas, observación; el Sistema de Control Interno basado en el método COSO II, , que permitió desarrollar un mejor trabajo. Finalmente se generó un informe de Auditoría que contiene debilidades encontradas durante la ejecución de la auditoría periodo Enero 2013 – Diciembre 2013, con sus respectivas conclusiones y recomendaciones, cada una de estas encaminan a contribuir el desarrollo de grandes proyectos que contribuyan con la reducción crónica de desnutrición en niños de 0 a 5 años de la Provincia de Chimborazo con el uso de los recursos, fortalecimiento de las debilidades, mejor desempeño laboral, cumplimiento de políticas y procedimientos que mejoren la gestión.es_ES
dc.description.abstractThe present thesis contains an Integral Audit to the Project "Creciendo con Nuestros Wawas" of the Decentralized autonomus goverment of the Province of Chimborazo in Riobamba, period2013. Where the gradeof efficiency, efficacy, economy, ecology, equity and ethies were evaluated with which the existing resources and the staff performance are managed, achieving in This way the fulfillment of the objetives and goals. The structure of the Control established by the program using the method COSO II was evaluated in the extension in which it is considered necessary to determine the nature, opportunity and extension of the procedures of audit needed to express an opinion about the those statements. To achieve the purpose it was necessary to deepen the theory that related to the object of study, reference is made to: International Accouting Standards promulgated by IFAC and the requirements of the respective agreement with the World Bank, conceptualization of Integral Audit, Evaluation of the Internalñ control System, audit working papers, developmental findings and report writing, also communication of results, audit methods such as questionnaires, interviews, Observation: the Internal Control Systems base don the COSO II method, which allowed to develop a better job. Finally an audit report was generated that contains weaknesses found during the execution of the audit period January 2013-December 2013, with is respective conclusions and recommendations, each of the these direct to contribute to the development of big projects that help to the chronic reduction of mal nutrition in children from 0 to 5 years of the Province of Chimborazo with the use of the resources, strengthening of the weaknesses, better labor performance, fulfillment of politics and procedures that improve the management.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFADE;82T00433-
dc.subjectAUDITORÍA INTEGRALes_ES
dc.subjectPROYECTO CRECIENDO CON NUESTROS WAWASes_ES
dc.subjectGOBIERNO AUTÓNOMO DESCENTRALIZADO DE CHIMBORAZOes_ES
dc.subjectCONTROL INTERNOes_ES
dc.subjectCOSO IIes_ES
dc.subjectNORMAS INTERNACIONALES DE CONTABILIDAD (NIC)es_ES
dc.subjectRIOBAMBA (CANTÓN)es_ES
dc.titleAuditoría integral al proyecto “Creciendo con Nuestros Wawas” del Gobierno Autónomo Descentralizado de la provincia de Chimborazo de la ciudad de Riobamba, período 2013es_ES
dc.typebachelorThesises_ES
dc.contributor.miembrotribunalCevallos Vique, Víctor Oswaldo-
Aparece en las colecciones: Ingeniero/a en Contabilidad y Auditoría; Licenciado/a en Contabilidad y Auditoría

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
82T00433.pdf2,5 MBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.