Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/5060
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorSantillán, Marco-
dc.contributor.authorGuevara Layedra, Jaime Robert-
dc.date.accessioned2016-07-22T15:19:51Z-
dc.date.available2016-07-22T15:19:51Z-
dc.date.issued2016-06-
dc.identifier.citationGuevara Layedra, Jaime Robert. (2016). Auditoría del mantenimiento preventivo mayor de los motores Wartsila Vasa 32 y 6R 32 ejecutados en la empresa Oleoducto de Crudos Pesados en el año 2015. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/5060-
dc.descriptionEn la presente investigación audita y evalúa los resultados positivos o negativos, en la ejecución de los Mantenimientos Preventivos Mayores planificados para el año 2015 en los Motores Wartsila Vasa 32 y 6R, realizados por el personal de técnicos que mantiene la Empresa Oleoducto de Crudos Pesados (OCP) Ecuador, ubicados en las estaciones de bombeo oriente en las provincias de Pichincha, Napo y Sucumbíos. Para el mencionado estudio se utilizo como metodología la investigación científica, evaluando de forma lógica, deductiva y comparativa los procesos aplicados en el Mantenimiento Preventivo Mayor, el cálculo matemático, estadístico y Probalístico contribuyo también en el estudio, para establecer un punto de comparación cualitativa y cuantitativa en la gestión de los recursos empleados, con la finalidad de devolver la función a los equipos intervenidos y garantizar una operación segura del Oleoducto de Crudos Pesados. Se establece también una referencia para evaluar el comportamiento y actitud de las personas que conforman el grupo de Mantenimiento Mayor, establecer si el riesgo asumido por la dirección de mantenimiento contribuyo efectivamente a la disminución de costos, la confiabilidad medida del 66% antes de la intervención de los equipos planificados para el año 2015 fue comparada con la confiabilidad obtenida luego de la intervención medida en un 84% ejecutada por los técnicos internos de la empresa, también se establecieron tiempos de ejecución de tareas, retrasos y rendimiento. La investigación es un aporte para mejorar los conocimientos sobre la gestión del manteniendo, y establecer a la auditoría como una herramienta de avaluación continua de procesos, en la ejecución del plan de mantenimiento que garantiza la disponibilidad del oleoducto, lo cual aportará positivamente a la toma de decisiones con datos que permitan disminuir la repetición de trabajos y mejorar la calidad del servicio prestado.es_ES
dc.description.abstractIn the present investigation is audited and assessed the positive or negative results in the execution of Major Maintenance planned for 2015 in the Engines Wartsila Vasa 32 an 6R created by the staff of technicians who maintains the Oil Pipeline Company Heavy Oil (PCO) Ecuador located in the eastern pumping station in the provinces of Pichincha, Napo and Sucumbíos. For the aforementioned study the methodology used was scientific research to evaluate logically deductive and comparative processes applied in the Major Preventive Maintenance Besides: mathematical, statistical and probabilistic calculation contributed to the study to establish a qualitative and quantitative point of comparison in the management of the resources used in order to return function to the operated equipment and safe operation of the heavy crude oil pipeline. In addition a reference is established to assess the behavior and attitude of the people who make up the group of Major Maintenance, establish whether the risk assumed by the maintenance management to contribute effectively to lower costs, reliability as 66% preoperatively teams planned for 2015 it was compared with the reliability of the measurement obtained after intervention by 84% executed by internal technicians of the company, task execution times, delays and performance were also established. The research is a contribution to improving knowledge of maintenance management and establish audit as a tool of a continuous evaluation process, in the execution of the maintenance plan that guarantees the availability of the pipeline, which will contribute positively to the decision taken with data to reduce rework and improve the quality of the service.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTIPEC;20T00746-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectOLEODUCTO DE CRUDOS PESADOSes_ES
dc.subjectMANTENIMIENTO MAYORes_ES
dc.subjectMOTORES WARTSILAes_ES
dc.subjectCONFIABILIDADes_ES
dc.subjectINGENIERÍA EN MANTENIMIENTOes_ES
dc.subjectTECNOLOGÍA Y CIENCIAS DE LA INGENIERÍAes_ES
dc.titleAuditoría del mantenimiento preventivo mayor de los motores Wartsila Vasa 32 y 6R 32 ejecutados en la empresa Oleoducto de Crudos Pesados en el año 2015es_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.contributor.miembrotribunalGranizo, José Antonio-
dc.contributor.miembrotribunalProaño, Fernando-
dc.rights.urihttps://creativecommons.org.//licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Maestrias: Modalidad Proyectos de Investigación y Desarrollo

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
20T00746.pdf3,85 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons