Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/4758
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorUsiña, José-
dc.contributor.authorLalangui Delgado, Darwin Antonio-
dc.date.accessioned2016-05-19T21:43:30Z-
dc.date.available2016-05-19T21:43:30Z-
dc.date.issued2015-10-
dc.identifier.citationLalangui Delgado, Darwin Antonio. (2015). Rediseño de la Planta de Tratamiento de Agua Residual, aplicando un sistema de humedal artificial con flujo superficial en la Extractora Teobroma. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/4758-
dc.descriptionCon el objetivo de mejorar el rendimiento de la Extractora de palma de aceite Teobroma, y evitar un impacto ambiental por descarga de residuos líquidos proveniente de la industria, se rediseñó la planta de tratamientos de aguas residuales para la extractora que está ubicada en el km 34 vía Santo Domingo- Esmeraldas. Se realizó el reconocimiento del área de investigación, luego se tomó muestras de la actual planta de tratamiento, antes y después del proceso en horarios diferentes: 09h00 a 11h00 y 14h00 a 15h00, obteniendo una muestra compuesta para los respectivos análisis. Los análisis preliminares se realizaron en el laboratorio de análisis técnico de la Facultad de Ciencias de la Escuela Superior Politécnica del Chimborazo, obteniendo los siguientes resultados: Demanda Bioquímica de Oxígeno (DBO5) 2700 mg/L, Demanda Química de Oxígeno 4500 mg/L, Aceites y Grasas 187,50 mg/L, Sólidos en Suspensión 494,50 mg/L, Nitrógeno Amoniacal 125 mg/L, Sólidos Totales 6184 mg/L, Coliformes Fecales 4200 UFC/100ml. Los parámetros citados se encuentran fuera de los límites permisibles de la normativa ambiental del Texto Unificado de Legislación Secundaria del Medio Ambiente (TULSMA). Con estos parámetros se determinó un tratamiento adecuado para las aguas residuales originadas en la extractora. Con el rediseño de la planta de tratamiento de aguas residuales se obtuvieron porcentajes de remoción: DBO5 99,9%, DQO 99,9%, Nitrógeno Amoniacal 57,9 %, Sólidos en suspensión 99,9%, Sólidos totales 99,5%, Aceites y grasas 99,6%, Coliformes fecales 99,4%. Se concluye que el tratamiento utilizado es eficiente de tal manera que existe una remoción alta de los contaminantes del agua residual. Se recomienda a la extractora la implementación del humedal de flujo libre y un filtro rápido de arena, para evitar la contaminación del río Blanco que atraviesa el Cantón la Concordia.es_ES
dc.description.abstractIn order to improve the perfomance of palm oil extractor Teobroma and avoid environmental impact by discharging liquid waste from industry, plant wastewater treatment was redesigned for the extractor plant located km 34 Santo Domingo- Esmeraldas way road. Recognition of the research área was perfomed, the samples the current treatment plant was taken before and after the process at different time: 9h00 to 11h00 and 14h00to 15h00, obtaining a composite simple fot the respective analysis. Preliminary analyzes were performed in the laboratory of technical analysis of the Science Faculty at Polytechnic School of Chimborazo, with the following results: Biochemical Oxygen Demand (BOD 5) 2700 mg / L, Chemical Oxygen Demand 4500 mg / L, Oils and Fats 187.50 mg / L, suspended solids 494.50 mg / L, ammonia nitrogen 125 mg / L, total solids 6184 mg / L, 4200 UFC fecal coliform / 100ml. The parameters are outside of the áter ible limits of environmental regulations unified secondary environmental legislation (USER) text. With these parameters proper treatment for waste áter originating from the extractor was determined. With the redesign of the plant wastewater treatment removal percentages obtained were: 99.9% BOD 5, COD 99.9%, 57.9% ammonia nitrogen, suspended solids 99.9% 99.5% total solids , oil and grease 99.6%, 99.4% fecal coliforms. It is conclude that the treatment is used efficiently so that there is a high removal of contaminants from wastewater. Wetland implementing free flow and rapid sand filter is recommended to the extractor, to prevent contamination of the Rio Blanco river that run which crosses the Concordia canton.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazo.es_ES
dc.relation.ispartofseriesUDCTFC;96T00321-
dc.subjectREDISEÑO DE LA PLANTAes_ES
dc.subjectEXTRACTORA DE PALMA DE ACEITEes_ES
dc.subjectCARACTERIZACIÓN DEL AGUAes_ES
dc.subjectANÁLISIS DE AGUAes_ES
dc.subjectHUMEDAL DE FLUJO LIBREes_ES
dc.subjectTEXTO UNIFICADO DE LEGISLACION AMBIENTE [TULSMA]es_ES
dc.subjectINGENIERÍA QUÍMICAes_ES
dc.subjectCONCORDIA (CANTÓN)es_ES
dc.subjectSANTO DOMINGO DE LOS TSACHILAS (PROVINCIA)es_ES
dc.titleRediseño de la Planta de Tratamiento de Agua Residual, aplicando un sistema de humedal artificial con flujo superficial en la Extractora Teobroma.es_ES
dc.typebachelorThesises_ES
dc.contributor.miembrotribunalParada, Mabel-
Aparece en las colecciones: Ingeniero/a Químico/a

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
96T00321 UDCTFC.pdf4,97 MBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.