Por favor, use este identificador para citar o enlazar este ítem:
http://dspace.espoch.edu.ec/handle/123456789/22675
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Tene Narváez, Héctor Ramiro | - |
dc.date.accessioned | 2024-08-23T23:31:37Z | - |
dc.date.available | 2024-08-23T23:31:37Z | - |
dc.date.issued | 2024-03-20 | - |
dc.identifier.citation | Tene Narváez, Héctor Ramiro.(2024). Mejora de la productividad en la fabricación de las partes del techo aplicando el estudio de métodos y medición del trabajo en el área de fibrado de la Empresa Carrocería CAR – buss Yaulema del Cantón Riobamba. Escuela Superior Politécnica de Chimborazo. Riobamba. | es_ES |
dc.identifier.uri | http://dspace.espoch.edu.ec/handle/123456789/22675 | - |
dc.description | En la actualidad la empresa "Carrocería Car-Buss Yaulema" se dedica a la fabricación de buses interprovinciales, y dentro del área de fibrado realizan las partes del techo, donde se pudo probar que su método de producción no está estandarizado, lo que generó que se realicen tareas con pérdida de tiempo, provocando que las partes del techo de fibra de vidrio no se entregaran a tiempo. Por ello el presente trabajo tuvo por objetivo mejorar la productividad en la fabricación de las partes del techo aplicando el estudio de métodos y medición del trabajo en el área de fibrado de la empresa Carrocería Car – Buss Yaulema del cantón Riobamba. Utilizando la metodología que tuvo un enfoque mixto, que inició con la recolección de información, tomando el tiempo de las actividades del proceso productivo que realizan, también se trabajó con diagramas de flujo, recorrido y de proceso que permitió conocer las actividades que se desarrollan en cada puesto de trabajo con el fin de estandarizar el procedimiento productivo eliminando movimientos innecesarios y tiempos inactivos dentro del proceso. Se aplicó la técnica del cronometraje que permitió identificar factores que generan tiempos muertos los cuales limitan la efectividad del trabajo. Logrando como resultado la disminución del tiempo de producción de la parte delantera, central y posterior en un 26,52%; 32,57% y 30,26% respectivamente, aumentando el índice de producción en un 34%, es decir se logró producir en un tiempo de 1 h 16 min 51,6 segundos; 5 h 4 min 0,6 segundos y 1 h 56 min 37,8 segundos respectivamente cada pieza. Concluyendo que la empresa puede tener una eficiente producción mediante la incorporación de equipos y técnicas que generen una mejora significativa en la capacidad de producción, ya que la propuesta con el nuevo método muestra un incremento en la producción. | es_ES |
dc.description.abstract | Currently, the company "Carrocería Car-Bus Yaulema" is engaged in the manufacture of interprovincial buses. In the fiberglass area, they produce roof parts, where it was found that their production method is not standardized. This led to time-wasting tasks, causing delays in the delivery of fiberglass roof parts. Therefore, this study aimed to improve productivity in the manufacture of roof parts by applying methods of study and work measurement in the fiberglass area of Carrocería Car-Bus Yaulema in Riobamba canton. Using a mixed-method approach, the methodology began with data collection, including timing the activities of the production process. Flow diagrams, route diagrams, and process diagrams were also used to understand the activities at each workstation, aiming to standardize the production procedure by eliminating unnecessary movements and inactive times within the process. The time study technique was applied to identify factors causing downtime that limit work effectiveness. As a result, production time for the front, central, and rear parts decreased by 26.52%, 32.57%, and 30.26% respectively, increasing the production rate by 34%. This means each part was produced in 1 hour, 16 minutes, and 51.6 seconds; 5 hours, 4 minutes, and 0.6 seconds; and 1 hour, 56 minutes, and 37.8 seconds respectively. In conclusion, the company can achieve efficient production by incorporating equipment and techniques that significantly improve production capacity, as the proposed new method demonstrates an increase in production. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Escuela Superior Politécnica de Chimborazo | es_ES |
dc.relation.ispartofseries | UDCTFM;85T00834 | - |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.subject | MEJORA DE LA PRODUCTIVIDAD | es_ES |
dc.subject | FIBRADO | es_ES |
dc.subject | ESTUDIO DE MÉTODOS | es_ES |
dc.subject | MEDICIÓN DEL TRABAJO | es_ES |
dc.subject | DIAGRAMA DE RECORRIDO | es_ES |
dc.subject | ESTANDARIZACIÓN | es_ES |
dc.subject | CRONOMETRAJE | es_ES |
dc.title | Mejora de la productividad en la fabricación de las partes del techo aplicando el estudio de métodos y medición del trabajo en el área de fibrado de la Empresa Carrocería CAR – buss Yaulema del Cantón Riobamba | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.contributor.miembrotribunal | Bonilla Novillo, Sayuri Monserrath | - |
dc.contributor.miembrotribunal | Naranjo Vargas, Eugenia Mercedes | - |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
Aparece en las colecciones: | Ingeniero Industrial |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
85T00834.pdf | 3 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons