Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/22138
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorLeón Chimbolema, José Gerardo-
dc.contributor.authorTibanlombo Chisag, Byron Joel-
dc.date.accessioned2024-07-04T15:31:25Z-
dc.date.available2024-07-04T15:31:25Z-
dc.date.issued2023-08-02-
dc.identifier.citationTibanlombo Chisag, Byron Joel. (2023). Diseño de una planta de tratamiento de aguas residuales para el Hospital General Ambato. Escuela Superior Politécnica de Chimborazo. Riobambaes_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/22138-
dc.descriptionEl rápido crecimiento poblacional ha intensificado el desafío del tratamiento de aguas residuales, generando una preocupación ambiental y una notable contaminación. El objetivo principal de este estudio fue diseñar una Planta de Tratamiento de Aguas Residuales (PTAR) para el Hospital General Ambato, ubicado en la provincia de Tungurahua. Para lograrlo, se llevaron a cabo varias etapas. En primer lugar, se realizó la medición del caudal utilizando el método volumétrico durante un periodo de 4 días consecutivos, desde las 8:00 am hasta las 4:00 pm. Posteriormente, se recolectaron muestras siguiendo la Norma Técnica Ecuatoriana NTE INEN 2169:2013. Estas muestras se analizaron en el Laboratorio de Control de Calidad del E.P-EMAPA-G, permitiendo identificar ciertos parámetros que excedían los límites especificados en la Tabla 8 del Anexo 1 del Libro VI de TULSMA. Estos parámetros incluyen DBO5, DQO, nitrógeno total Kjeldahl, pH, sólidos suspendidos totales y sólidos sedimentables. Para determinar la tratabilidad del efluente, se realizaron pruebas utilizando el método de test de jarra con PAC (Policloruro de Aluminio) al 2% y CHEMFLOC al 0,9%. Los resultados mostraron que se podría eliminar aproximadamente el 89% de los sólidos en suspensión, el 98% de los sólidos sedimentables, el 96% de la DQO, el 96% de la DBO5 y el 96% del nitrógeno total. Estos resultados respaldan la factibilidad técnica del proyecto. El diseño de la PTAR del Hospital General Ambato se realizó siguiendo cálculos de ingeniería y criterios de diseño. La planta incluye rejillas de limpieza manual, tanques de homogeneización, tanques de coagulación-floculación y un sedimentador convencional circular. El costo estimado de construcción de la planta es de aproximadamente 17045,36 dólares, que abarca tanto la infraestructura como la ingeniería civil necesarias para su construcción.es_ES
dc.description.abstractThe rapid population growth has intensified the challenge of wastewater treatment, generating environmental concern as well as significant pollution. The aim of this study was to design a Wastewater Treatment Plant (WWTP) for Hospital General Ambato, located in Tungurahua province. To achieve the goals, several stages were carried out. First, the flow rate was measured using the volumetric method during 4 consecutive days, from 8:00 am to 4:00 pm. Subsequently, samples were collected based on the NTE INEN 2169:2013 Ecuadorian Technical Standard. These samples were analyzed at the E.P-EMAPA-G Quality Control Laboratory, this allowed identifying certain parameters which exceed the limits specified in Table 8, Annex 1, of TULSMA VI Book. These parameters include BOD5, COD, total Kjeldahl nitrogen, pH, total suspended solids and settleable solids. To determine the treatability of the effluent, tests were conducted using the jar test method with 2% PAC (Poly Aluminum Chloride) and 0.9% CHEMFLOC. The results determined that approximately 89% of suspended solids, 98% of settleable solids, 96% of COD, 96% of BOD5 and 96% of total nitrogen could be removed. These results support the technical feasibility of the project. The design of the WWTP for the Hospital General Ambato was based on engineering calculations and design criteria. The plant includes manual cleaning grids, homogenization tanks, coagulation-flocculation tanks, and a conventional circular settler. The estimated construction cost of the plant is approximately $17045.36, which covers both, infrastructure and civil engineering which are required for its construction.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFC;236T0913-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectHOSPITAL GENERAL AMBATOes_ES
dc.subjectPLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)es_ES
dc.subjectAGUA RESIDUALes_ES
dc.subjectTEST DE JARRA>, <TULSMAes_ES
dc.subjectTUNGURAHUA (PROVINCIA)es_ES
dc.titleDiseño de una planta de tratamiento de aguas residuales para el Hospital General Ambatoes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalBeltrán Dávalos, Andrés Agustín-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero/a en Biotecnología Ambiental; Ingeniero/a Ambiental

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
236T0913.pdf2,46 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons