Por favor, use este identificador para citar o enlazar este ítem:
http://dspace.espoch.edu.ec/handle/123456789/21977
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Gallegos Londoño, César Marcelo | - |
dc.contributor.author | Arévalo Arévalo, Dennis Omar | - |
dc.date.accessioned | 2024-07-01T19:51:07Z | - |
dc.date.available | 2024-07-01T19:51:07Z | - |
dc.date.issued | 2022-03-09 | - |
dc.identifier.citation | Arévalo Arévalo, Dennis Omar. (2022). Elaboración de un plan de mantenimiento basado en la metodología del RCM para activos críticos de la Central Hidroeléctrica de ALAO de la EERSA. Escuela Superior Politécnica de Chimborazo. Riobamba. | es_ES |
dc.identifier.uri | http://dspace.espoch.edu.ec/handle/123456789/21977 | - |
dc.description | RESUMEN El presente trabajo de integración curricular tuvo como finalidad elaborar un plan de mantenimiento basado en la metodología del Mantenimiento Centrado en Confiabilidad (RCM) para los activos críticos de la Central Hidroeléctrica de Alao de la EERSA. Para desarrollar el plan de mantenimiento en primer lugar se realizó un análisis de criticidad para jerarquizar a los activos críticos de la central. Posterior a ello, se basó en el proceso detallado de la metodología “RCM”, la cual consistió en realizar un análisis funcional del activo físico dentro de un contexto operacional actual, a través de dar respuesta a 7 preguntas que son: ¿Cuáles son las funciones y los parámetros de funcionamiento asociados al activo en su actual contexto operacional?, ¿De qué manera falla en satisfacer dichas funciones?, ¿Cuál es la causa de cada falla funcional?, ¿Que sucede cuando ocurre cada falla?, ¿En qué sentido es importante cada falla?, ¿Qué puede hacerse para prevenir o predecir cada falla?, ¿Qué debe hacerse si no se encuentra una tarea proactiva adecuada?. La información que se obtuvo al dar respuesta a las 5 primeras preguntas, fueron documentadas en la hoja de información del RCM, mientras que para dar respuesta y documentar las dos últimas preguntas se utilizó el diagrama y la hoja de decisión del RCM. La aplicación de la metodología “RCM” dio como resultado un plan de mantenimiento compuesto por 172 tareas preventivas con sus respectivas frecuencias y logística de mantenimiento para todos los sistemas críticos. Se concluyó que, la metodología “RCM” permite elaborar planes de mantenimiento eficaces, ya que determina que se debe hacer para asegurar que el activo se encuentre disponible en su contexto operacional actual. Se recomienda implementar el plan de mantenimiento preventivo elaborado en este trabajo. | es_ES |
dc.description.abstract | SUMMARY The purpose of this curricular integration research was to design a maintenance plan based on the Reliability Centered Maintenance (RCM) methodology for the critical assets of the Alao Hydroelectric Power Plant of EERSA. To develop the maintenance plan, first a criticality analysis was carried out to rank the most critical assets of the power plant. After that, it was based on the detailed process of the "RCM" methodology, which consisted of performing a functional analysis of the physical asset within a current operational background, by answering 7 questions:What are the functions and operating parameters associated with the asset in its current operational context? In what way does it fail to satisfy those functions? What is the cause of each functional failure? What happens when each failure occurs? In what sense is each failure important? What can be done to prevent or predict each failure? What should be done if a suitable proactive task is not found? The information obtained by answering the first 5 questions were compiled in the RCM information sheet, while the RCM diagram and the RCM decision sheet were incorporated to answer and document the last two questions. The application of "RCM" methodology has resulted in a maintenance plan formed by 172 preventive tasks with their respective frequencies and maintenance logistics for all critical systems. It was concluded that, the "RCM" methodology allows the elaboration of successful maintenance plans, since it determines what must be done to ensure that the asset is available in its current operational context. It is recommended to implement the preventive maintenance plan designed in this work. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Escuela Superior Politécnica de Chimborazo | es_ES |
dc.relation.ispartofseries | UDCTFM;25T00551 | - |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.subject | INGENIERÍA EN MANTENIMIENTO | es_ES |
dc.subject | PLAN DE MANTENIMIENTO | es_ES |
dc.subject | MANTENIMIENTO CENTRADO EN CONFIABILIDAD (RCM) | es_ES |
dc.subject | MANTENI MIENTO PREVENTIVO | es_ES |
dc.subject | CENTRAL HIDROELÉCTRICA | es_ES |
dc.subject | ANÁLISIS DE CRITICIDAD | es_ES |
dc.title | Elaboración de un plan de mantenimiento basado en la metodología del RCM para activos críticos de la Central Hidroeléctrica de ALAO de la EERSA | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.contributor.miembrotribunal | Villacrés Parra, Sergio Raúl | - |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
Aparece en las colecciones: | Ingeniero de Mantenimiento; Ingeniero/a en Mantenimiento Industrial |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
25T00551.pdf | 2,82 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons