Por favor, use este identificador para citar o enlazar este ítem:
http://dspace.espoch.edu.ec/handle/123456789/21647
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Vásconez Núñez, Daniela Carina | - |
dc.contributor.author | Aulla Vargas, Marcia Elizabeth | - |
dc.date.accessioned | 2024-06-13T20:55:46Z | - |
dc.date.available | 2024-06-13T20:55:46Z | - |
dc.date.issued | 2023-08-21 | - |
dc.identifier.citation | Aulla Vargas, Marcia Elizabeth. (2023). Evaluación hidráulica del sistema de bombeo del área de hidromasajes y duchas del Complejo Turístico Los Elenes del cantón Guano. Escuela Superior Politécnica de Chimborazo. Riobamba. | es_ES |
dc.identifier.uri | http://dspace.espoch.edu.ec/handle/123456789/21647 | - |
dc.description | El complejo turístico “Los Elenes” fue afectado por el aluvión el 11 de diciembre del 2021, el cual ocasionó daños en los sistemas de bombeo de hidromasajes y duchas, por lo tanto, el presente trabajo tuvo como objetivo realizar una evaluación hidráulica del sistema de bombeo del área de hidromasajes y duchas del complejo turístico Los Elenes del Cantón Guano. Utilizando una metodología que se inició evaluando la situación actual de los sistemas de bombeo y los componentes hidráulicos del área de hidromasajes y duchas a través de una visita de campo; se elaboraron planos de la instalación hidráulica utilizando los programas AutoCad e Inventor, posteriormente, se analizaron las especificaciones técnicas de las bombas y demás accesorios con el fin de establecer una propuesta de repotenciación del sistema de bombeo. Finalmente, se diseñó la señalética necesaria para evitar riesgos en la operación del sistema utilizando la norma NTP 330 y NTE INEN-ISO 3864-1:2013. Obteniendo como resultado cuatro bombas para la propuesta de repotenciación, una bomba centrífuga Pedrollo NGA 1A para la alimentación del hidromasaje y polar, una bomba sumergible de pozo Pedrollo 3SR 2/5 para la alimentación de las duchas, y bombas centrífugas Pedrollo AL-RED 620-4 una para la recirculación del hidromasaje y la otra para la recirculación del polar; para la señalética se identificaron los riesgos, los cuales son: riesgo de caída al mismo nivel, riesgo de choque con objetos inmóviles, riesgo de contacto eléctrico, riesgo de exposición a altas temperaturas, riesgo de intoxicación por gases y riesgo de caída a distinto nivel. Concluyendo que las bombas de recirculación del hidromasaje y polar se instalen a 20cm desde el nivel del piso para evitar que sufran daños. Con este análisis se pretende mejorar el servicio enfocado en estas áreas para potenciar el turismo de la zona. | es_ES |
dc.description.abstract | "Los Elenes" tourist attraction was affected by a flood on December 11, 2021, which brought about damages to the hydromassage and shower pumping systems; therefore, the objective of this research was to carry out a hydraulic evaluation of the pumping system of the hydromassage and shower area in "Los Elenes" tourist attraction in Guano Canton. Through a methodology that began by evaluating the current situation of the pumping systems and the hydraulic components of the hydromassage and shower area starting with a field visit, plans of the hydraulic installation were drawn up with AutoCad and Inventor programs, then the technical specifications of the pumps and other accessories were analyzed in order to establish a proposal for the repowering of the pumping system. Finally, the necessary signage was designed to avoid risks in the operation of the system using NTP 330 and NTE INEN-ISO 3864-1:2013 standards. Achieving as a result four pumps for the repowering proposal, a Pedrollo NGA 1A centrifugal pump for feeding the hydromassage and polar, a Pedrollo 3SR 2/5 submersible well pump for feeding the showers, and Pedrollo AL-RED 620-4 centrifugal pumps one for recirculation of the hydromassage and the other for recirculation of the polar; for the signage the risks were identified, which are: risk of falling to the same level, risk of collision with immobile objects, risk of electrical contact, risk of exposure to high temperatures, risk of gas intoxication and risk of falling to a different level. It was concluded that the whirlpool and polar recirculation pumps should be installed at 20 cm from the floor level to avoid damage. Based on this analysis, it is expected to improve the service focused on these areas in order to enhance tourism in the area. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Escuela Superior Politécnica de Chimborazo | es_ES |
dc.relation.ispartofseries | UDCTFM;85T00814 | - |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.subject | TECNOLOGÍA Y CIENCIAS DE LA INGENIERÍA | es_ES |
dc.subject | EVALUACIÓN HIDRÁULICA | es_ES |
dc.subject | SISTEMA DE BOMBEO | es_ES |
dc.subject | HIDROMASAJE | es_ES |
dc.subject | SEÑALÉTICA | es_ES |
dc.title | Evaluación hidráulica del sistema de bombeo del área de hidromasajes y duchas del Complejo Turístico Los Elenes del cantón Guano | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.contributor.miembrotribunal | Tello Oquendo, Fernando Mauricio | - |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
Aparece en las colecciones: | Ingeniero Industrial |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
85T00814.pdf | 8,45 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons