Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/20958
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorJácome Domínguez, Edwin Ángel-
dc.contributor.authorColcha Gagñay, Fausto Alfredo-
dc.contributor.authorTonato Soria, Jhonny Andrés-
dc.date.accessioned2024-05-06T16:05:31Z-
dc.date.available2024-05-06T16:05:31Z-
dc.date.issued2023-12-07-
dc.identifier.citationColcha Gagñay, Fausto Alfredo; Tonato Soria, Jhonny Andrés. (2023). Mantenimiento correctivo y puesta en operación de un caldero de 2 BHP de la Facultad de Ciencias de la ESPOCH. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/20958-
dc.descriptionEn el presente trabajo de integración curricular, se realizó la puesta en operación de un caldero de 2 BHP de la Facultad de Ciencias, determinando el estado técnico y funcionamiento del equipo antes de la reparación, se realiza un análisis a las fallas en cada componente, lo que llevó a la mejora de generación de vapor. Para monitorear al activo se elaboró un plan de mantenimiento basado en el RCM, metodología que se utiliza para mejorar la confiabilidad y el rendimiento del equipo industrial, y juntamente con las recomendaciones y estandarizaciones de la norma SAE JA1011 para optimizar la gestión del mantenimiento y aumentar la eficiencia operativa. Se determinaron los componentes críticos, incluyen la producción de vapor a una presión y temperatura específicas, como la prevención de fallas que pudieran causar paradas no planificadas a través de una matriz de criticidad, se determinaron las tareas de mantenimiento que debían llevarse a cabo para prevenir fallas identificadas. Estas tareas incluyeron inspecciones periódicas, reemplazo de componentes desgastados y ajustes de parámetros operativos. El proceso de reparación se realizaron ensayos de funcionamiento y pruebas de presión de trabajo, las pruebas definidas dentro el código ASME B31.3 para tuberías a presión que encuentran las especificaciones para pruebas no destructivas para garantizar la función requerida y asegurar el cumplimiento de los estándares de seguridad y rendimiento. Los resultados obtenidos se los puede evidenciar en el estado físico de cada elemento que conforma el caldero, pues en calidad de vapor se genera un 99%. El plan mantenimiento realizado han permitido obtener un análisis más exacto del comportamiento del equipo. Se recomienda efectuar las tareas de mantenimiento propuestas para mantener la función requerida de los sistemas y subsistemas del caldero y leer su manual de operación antes y durante de cada práctica.es_ES
dc.description.abstractIn the present work of curricular integration, the commissioning of a 2 BHP boiler the Science Faculty was carried out, determining the technical state and operation of the equipment before the repair, an analysis of the failures in each component was carried out, which led to the improvement of steam generation. A maintenance plan was developed based on the RCM to monitor the asset. This methodology is used to improve the reliability and performance of industrial equipment, together with the recommendations and standardizations of the SAE JA1011 standard, to optimize maintenance management and increase operational efficiency. The critical components were determined, including the production of steam at a specific pressure and temperature, preventing failures that could cause unplanned stops through a criticality matrix, and the maintenance tasks that had to be carried out to prevent identified failures. These tasks included periodic inspections, replacement of worn components, and adjustments of operating parameters. The repair process included functional tests and working pressure tests, defined within the ASME B31.3 code for pressure pipes that meet the specifications for non-destructive testing to guarantee the required function and ensure compliance with safety and performance standards. The results can be seen in the physical state of each element that makes up the cauldron since 99% is generated as steam. The maintenance plan has allowed us to obtain a more exact analysis of the equipment's behavior. It is recommended that the proposed maintenance tasks be carried out to maintain the required function of the boiler systems and subsystems and read the operation manual before and during each practice.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;25T00548-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectTECNOLOGÍA Y CIENCIAS DE LA INGENIERÍAes_ES
dc.subjectCALDERO PIROTUBULARes_ES
dc.subjectANÁLISIS DE LOS MODOS DE FALLAes_ES
dc.subjectPLAN DE MANTENIMIENTOes_ES
dc.subjectANÁLISIS DE CRITICIDADes_ES
dc.subjectGESTIÓN DE MANTENIMIENTOes_ES
dc.titleMantenimiento correctivo y puesta en operación de un caldero de 2 BHP de la Facultad de Ciencias de la ESPOCHes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalOrdoñez Viñán, Marco Antonio-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero de Mantenimiento; Ingeniero/a en Mantenimiento Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
25T00548.pdf2,57 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons