Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/20487
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorTrujillo Villacis, José Vicente-
dc.contributor.authorCuadrado Aguayo, Bolívar Santiago-
dc.date.accessioned2024-04-01T14:59:50Z-
dc.date.available2024-04-01T14:59:50Z-
dc.date.issued2024-02-
dc.identifier.citationCuadrado Aguayo, Bolívar Santiago. (2024). Diseño hidráulico del sistema de riego parcelario para el Proyecto Chambo Guano Los Chingazos – Fase II, en el Módulo 3, comunidad Chingazo Alto del cantón Guano. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/20487-
dc.descriptionEl objetivo de este estudio fue realizar el diseño hidráulico del sistema de riego parcelario para el proyecto Chambo Guano los Chingazos – Fase II, en el módulo 3, comunidad Chingazo Alto del cantón Guano. El estudio inició con la colocación de 54 puntos de control para el plan de vuelo, se obtuvo una ortofotografía, modelo digital del terreno y curvas de nivel, utilizadas para la actualización del catastro y padrón de usuarios. De acuerdo con la topografía del terreno se ubicó el reservorio y en este lugar se elaboró estudios de suelos y calidad de agua, con los estudios preliminares se diseñó la red de conducción y distribución bajo criterios de diseño que permitan un correcto funcionamiento y un equilibrio Gen el costo de inversión para la construcción del proyecto. Se determinó que el caudal de diseño para el módulo 3 es de 34.75 Ls-1 y el caudal total para la comunidad Chingazo Alto es de 91 Ls-1, por lo que el volumen del reservorio es de 4600 m3. La distribución tiene una longitud de 10.11 km, diseñada en tubería PVC con diámetros entre 160 mm y 32 mm, para 61 predios agrupados en 28 submódulos con turnos de 3 horas cada 7 días, de acuerdo con el diseño agronómico. La infraestructura tendrá un costo de $ 504460.96 USD, lo que contempla: desarenador, reservorio, conducción, distribución, obras de arte y riego parcelario, con el 20% de indirectos. El reservorio sirve para 5 zonas de riego, con una inversión por hectárea de $ 6021.16 USD, ubicándose bajo el umbral de priorización del estado para proyectos de riego. Se recomienda que la junta de regantes inicie la búsqueda de recursos económicos para la ejecución de la obra civil, en donde la gestión de los beneficiarios es primordial para el éxito del proyecto.es_ES
dc.description.abstractThe aim of this study was to carry out the hydraulic design of the plot irrigation system for the Chambo Guano The Chingazos Project – Phase II, in module 3, Chingazo Alto Community of the Guano Canton. The study began with the placement of 54 control points for the flight plan, let the investigators get an orthophotography, digital model of the terrain and contour lines, which were used to update the cadastre and user register. According to the topography of the land, the reservoir was located and in this place soil and water quality studies were carried out. With the preliminary studies, the conduction and distribution network was designed under design criteria that allow correct functioning and balance in the investment cost for the construction of the project. It was determined that the design flow for module 3 is 34.75 Ls-1 and the total flow for the Chingazo Alto community is 91 Ls-1, so the volume of the reservoir is 4600 m3. The distribution has a length of 10.11 km, designed in PVC pipe with diameters between 160 mm and 32 mm, for 61 properties grouped into 28 submodules with 3-hour shifts every 7 days, in accordance with the agronomic design. The infrastructure will cost $504,460.96 USD, which includes: sand trap, reservoir, conduction, distribution, works of art and plot irrigation, with 20% indirect. The reservoir serves 5 irrigation zones, with an investment per hectare of $6021.16 USD, placing it under the state's prioritization threshold for irrigation projects. It is highly recommended that the irrigation board begins the search for economic resources for the execution of the civil works, where the management of the beneficiaries is essential for the success of the project.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTIPEC;20T01864-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectCHAMBO GUANOes_ES
dc.subjectCHINGAZO ALTOes_ES
dc.subjectDISEÑO HIDRÁULICOes_ES
dc.subjectORTOFOTOes_ES
dc.subjectRIEGO PARCELARIO.es_ES
dc.titleDiseño hidráulico del sistema de riego parcelario para el Proyecto Chambo Guano Los Chingazos – Fase II, en el Módulo 3, comunidad Chingazo Alto del cantón Guano.es_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.contributor.miembrotribunalGuilcapi Pacheco, Edmundo Danilo-
dc.contributor.miembrotribunalPeña Murillo, Robinson Fabricio-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Maestrias: Modalidad Tesis

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
20T01864.pdf1,9 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons