Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/20165
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCastro Gómez, Rosa del Pilar-
dc.contributor.authorMuñoz Lema, Segundo Rafael-
dc.date.accessioned2024-01-24T16:27:54Z-
dc.date.available2024-01-24T16:27:54Z-
dc.date.issued2024-01-20-
dc.identifier.citationMuñoz Lema, Segundo Rafael. (2024). Diseño agronómico de un sistema de riego parcelarlo para el Módulo 7 del Proyecto Chambo - Guano, Fase II, comunidad Chingazos, cantón Guano. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/20165-
dc.descriptionEl objeto de este estudio fue realizar el diseño agronómico de un sistema de riego parcelario para el módulo 7 del proyecto Chambo – Guano, fase II, comunidad Chingazos, cantón Guano, para lo cual se determinó la capacidad de campo, punto de marchitez permanente, densidad aparente y velocidad de infiltración. Además, se obtuvo el patrón de cultivo, precipitación, coeficiente del cultivo, evapotranspiración del cultivo, balance hídrico, necesidades netas, profundidad radicular, lamina bruta y el emisor. También, se realizó la encuesta socio-económica, la evaluación financiera y el presupuesto para la implementación. El módulo 7 presenta las siguientes características: textura arenosa, capacidad de campo de 7.7 %, punto de marchitez permanente de 2.1%, densidad aparente de 1.3 g cm-3. Los cultivos presentes son maíz, limón, fresa, chocho y mora. La necesidad neta es de 2.69 mm día-1, la lámina bruta es de 23.12 mm, la velocidad de infiltración es de 156.8 mm h-1. La frecuencia de riego calculado es cada siete días por 3 horas para el mini-Wobbler boquilla # 6. La propuesta con proyecto promovió la implementación de aguacate, la utilidad por familia es de USD 1 739.20 por año versus a USD 92.00 sin proyecto, el VAN es de USD 181 377, TIR 27.10%, B/C 1.05 y PRI 5.016 años. La inversión es de USD 192 797.67. Se concluye que los parámetros físicos del suelo son aptos para riego por microaspersión, además, se recomienda la siembra de aguacate, por lo tanto, la lámina bruta de riego es de 23.12 mm cada 7 días por tres horas. El estudio demostró una rentabilidad positiva. La inversión para la instalación del sistema de riego es de USD 4 988.29 por hectárea. Se recomienda a las entidades competentes realizar la gestión de recursos económicos para la implementación del sistema de riego.es_ES
dc.description.abstractThe purpose of this study was to carry out the agronomic design of a parcel irrigation system for Module 7 of the Chambo-Guano Project, Phase II, Chingazos community, Guano canton. To achieve this, field capacity, permanent wilting point, bulk density, and infiltration rate were determined. Additionally, crop pattern, precipitation, crop coefficient, crop evapotranspiration, water balance, net requirements, root depth, gross irrigation depth, and the emitter were obtained. A socio-economic survey, financial evaluation, and budget for implementation were also conducted. Module 7 has the following characteristics: sandy texture, field capacity of 7.7%, permanent wilting point of 2.1%, and bulk density of 1.3 g cm-3. The existing crops include corn, lemon, strawberry, chocho, and blackberry. The net water requirement is 2.69 mm day-1, the gross irrigation depth is 23.12 mm, and the infiltration rate is 156.8 mm h-1. The calculated irrigation frequency is every seven days for 3 hours using mini-Wobbler nozzle #6. The proposed project encourages the cultivation of avocados. The family income is USD 1,739.20 per year compared to USD 92.00 without the project. The NPV is USD 181,377, IRR is 27.10%, B/C is 1.05, and PRI is 5.016 years. The investment is USD 192,797.67. It is concluded that the soil's physical parameters are suitable for micro-sprinkler irrigation. Avocado cultivation is recommended, and the gross irrigation depth is 23.12 mm every 7 days for three hours. The study demonstrated positive profitability, with an investment of USD 4,988.29 per hectare for the irrigation system installation. Competent authorities are advised to manage financial resources for the implementation of the irrigation system.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTIPEC;20T01845-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectRIEGOes_ES
dc.subjectLÁMINA NETAes_ES
dc.subjectINFILTRACIÓNes_ES
dc.subjectREQUERIMIENTO HÍDRICOes_ES
dc.subjectDISEÑO PARCELARIOes_ES
dc.subjectCAUDALes_ES
dc.subjectMINI ASPERSORes_ES
dc.titleDiseño agronómico de un sistema de riego parcelarlo para el Módulo 7 del Proyecto Chambo - Guano, Fase II, comunidad Chingazos, cantón Guano.es_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.contributor.miembrotribunalParra León, Vicente Javier-
dc.contributor.miembrotribunalLindao Córdova, Víctor Alberto-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Maestrias: Modalidad Tesis

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
20T01845.pdf3,46 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons