dc.contributor.advisor | Ordoñez Guaycha, Christian Adrián | - |
dc.contributor.author | Cuenca Tenecota; Guzmán Arias, Walter Adrián; Xavier Alexander | - |
dc.date.accessioned | 2022-10-17T22:02:58Z | - |
dc.date.available | 2022-10-17T22:02:58Z | - |
dc.date.issued | 2022-05-20 | - |
dc.identifier.citation | Cuenca Tenecota, Walter Adrián; Guzmán Arias, Xavier Alexander. (2022). Diseño de excavación en la mina “El Pique”, mediante profundización inclinada, ubicada en el barrio El Tablón, cantón Portovelo, operado por la compañía OROCONCENT S.A. Escuela Superior Politécnica de Chimborazo. Macas. | es_ES |
dc.identifier.uri | http://dspace.espoch.edu.ec/handle/123456789/17546 | - |
dc.description | El objetivo de este proyecto técnico fue realizar un diseño de excavación para profundizar la mina El Pique de la empresa OROCONCET S.A. La metodología utilizó una investigación aplicada, desde la investigación documental sobre las características geológicas de la zona y las propiedades de roca dentro de la mina, así como la caracterización geométrica para definir la calidad de la roca. Esta información junto a la investigación de campo en la que se identificaron los insumos y materiales que posee la empresa en el área de extracción, determinaron las medidas y tipo de sección transversal del pique inclinado. Se realizó un diseño de excavación en relación con los ciclos operativos y en función del análisis de costos. El área geológica corresponde a la Unidad Portovelo con predominancia de roca tipo andesita con una calidad de 71, es decir, la calidad del macizo es buena. Considerada la calidad de la roca se optó por una forma transversal de pique de sección rectangular, la misma que permite la ergonomía del trabajador y aprovecha mejor el espacio para la movilización de maquinaria; se establecieron los diferentes ciclos operativos en relación con el análisis de costos directos e indirectos, estableciendo tres ciclos: perforación y voladura; transporte e izaje de material; y, ventilación y desagüe. Se determinó un valor por metro de avance de $ 665.86. Se recomienda el uso de explosivos de mayor poder rompedor y controlar de manera eficiente el radio de detonación, para evitar inestabilidad en las rocas. El uso de todos los implementos de seguridad y horarios rotativos para mantener la salud del talento humano que participe en la labor. | es_ES |
dc.description.abstract | The aim of this technical project was to carry out an excavation design to deepen the El Pique mine of the company OROCONCET S.A. An applied research was used as a methodology, from documentary research on the geological characteristics of the area and the rock properties inside the mine, as well as the geometric characterization to define the quality of the rock. This information and the field research in which the inputs and materials that the company has in the extraction area were identified, determined the measures and type of cross section of the inclined shaft. An excavation design was carried out in relation to the operating cycles and based on the cost analysis. The geological area corresponds to the Portovelo Unit with a predominance of andesite type rock with a quality of 71, which is the quality of the massif is good. Considering the quality of the rock, a rectangular cross-section pit was chosen, which allows ergonomics for the worker and makes better use of the space for the mobilization of machinery; the different operating cycles were established in relation to the analysis of direct and indirect costs, establishing three cycles: drilling and blasting; transport and hoisting of material; and ventilation and drainage. A value per meter of advance of $ 665.86 was determined. The use of explosives with higher breaking power and efficient control of the detonation radius is recommended to avoid rock instability. The use of all safety equipment and rotating schedules to maintain the health of the human talent were involved in the work. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Escuela Superior Politécnica de Chimborazo | es_ES |
dc.relation.ispartofseries | UDCTFRN;53T0058 | - |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.subject | CARACTERÍSTICAS GEOLÓGICAS | es_ES |
dc.subject | ÁREA DE EXTRACCIÓN | es_ES |
dc.subject | CALIDAD DE ROCA | es_ES |
dc.subject | ANDESITA | es_ES |
dc.title | Diseño de excavación en la mina “El Pique”, mediante profundización inclinada, ubicada en el barrio El Tablón, cantón Portovelo, operado por la compañía OROCONCENT S.A. | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.contributor.miembrotribunal | Reyes Céspedes, Ernesto | - |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
Aparece en las colecciones: | Ingeniería en Geología y Minas |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
53T0058.pdf | 4,52 MB | Adobe PDF | Visualizar/Abrir |