Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/16650
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorGarrido Bayas, Irma Yolanda-
dc.contributor.authorCuenca Amaguaya, Nathalia Lisbeth-
dc.date.accessioned2022-09-08T20:52:43Z-
dc.date.available2022-09-08T20:52:43Z-
dc.date.issued2022-03-08-
dc.identifier.citationDiseño de un sistema de costos por órdenes de producción para la empresa Esquissito, cantón Ambato, provincia de Tungurahua. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/16650-
dc.descriptionEl trabajo de investigación tuvo como finalidad diseñar un sistema de costeo por órdenes de producción para la empresa Esquissito, cantón Ambato, provincia de Tungurahua, que permita identificar con claridad el costo unitario de sus componentes, tales como: dentro de los costos directos; mano de obra, materia prima y costos indirectos tales como: materia prima indirecta, mano de obra indirecta y otros costos indirectos de producción. Para efectuar la investigación se aplicó diferentes técnicas, métodos e instrumentos que permitieron obtener información relevante para el desarrollo de la misma, como: observación directa, encuestas y entrevistas; metodológicamente, se trabajó con un enfoque cualitativo en los niveles exploratorio y descriptivo; fue de tipo observacional, retrospectiva y transversal, los métodos utilizados fueron histórico lógico, deductivo e inductivo. Para el diseño del sistema de costeo se aplicó una entrevista estructurada en donde se obtuvieron los siguientes resultados: sistema de costeo empírico lo cual no le permite de forma objetiva determinar el costo de producción, no tiene un control de la mano de obra, no realiza presupuestos de los costos indirectos de fabricación ya que trabaja solo con costos reales, no toma en cuenta los costos de mantenimiento de la planta y vehículos, finalmente se aplicó los datos obtenidos, lo que permitió determinar lo siguiente: el costo de la materia prima representa $0.34; para la mano de obra $0.05 y dentro de los costos indirectos de fabricación $0.06 sumando el costo unitario de $0.45, el costo para una funda de frejol de 250gr, el costo de la materia prima representa $0.25; para la mano de obra $0.26 y dentro de los costos indirectos de fabricación $0.36 sumando el costo unitario de $0.87. El costo para una funda de garbanzo de 250gr el costo de la materia prima representa $0.29; para la mano de obra $0.12 y dentro de los costos indirectos de fabricación $0.15 sumando el costo unitario de $0.56. En base a lo anterior, se sugiere al Gerente la aplicación del Sistema de Costeo por Órdenes de Producción propuesto, que permitirá tomar decisiones oportunas a nivel empresarial.es_ES
dc.description.abstractThe primary purpose of this research was to design a costing system per production order for the Esquissito company of Ambato canton in Tungurahua province. This system allows identifying the unit cost of its components, such as labor, and raw material, which corresponds to direct costs, and indirect raw material, indirect labor, and other indirect production costs corresponding to indirect costs. In addition, the different techniques, methods, and instruments, such as direct observation, surveys, and interviews, were necessary to collect relevant information to develop this research. Methodologically, this research process followed a qualitative approach at the exploratory and descriptive levels; it was observational, retrospective, and cross-sectional; the methods used were historical, logical, deductive, and inductive. For the design of the costing system, a structured interview was necessary reporting an empirical costing system that does not allow it to determine the cost of production objectively; it does not have control of the workforce, it does not perform budgets of the indirect manufacturing costs since it works only with actual costs, it does not consider the maintenance costs of the plant and vehicles. Finally, the data obtained was applied, which allowed determining the following: the cost of the raw material represents $0.34; for labor, $0.05 and within the indirect manufacturing costs $0.06 adding the unit cost of $0.45, the cost for a 250gr bean bag, the cost of the raw material represents $0.25; for labor $0.26 and within indirect manufacturing costs $0.36 adding the unit cost of $0.87. The cost for a 250gr chickpea bag, the cost of the raw material, represents $0.29; for labor, $0.12 and, within indirect manufacturing, costs $0.15, adding the unit cost of $0.56. Based on the previous, the application of the proposed Production Order Costing System is suggested to the Manager, which will allow for making timely decisions at the business level.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFADE;82T01243-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectCIENCIAS ECONÓMICAS Y ADMINISTRATIVASes_ES
dc.subjectSISTEMA DE COSTEOes_ES
dc.subjectÓRDENES DE PRODUCCIÓNes_ES
dc.subjectCOSTO UNITARIOes_ES
dc.subjectCOSTO DE PRODUCCIÓNes_ES
dc.subjectPRECIO DE VENTAes_ES
dc.subjectAMBATO (CANTÓN)es_ES
dc.titleDiseño de un sistema de costos por órdenes de producción para la empresa Esquissito, cantón Ambato, provincia de Tungurahuaes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalSamaniego Erazo, Floripes del Rocío-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero/a en Contabilidad y Auditoría; Licenciado/a en Contabilidad y Auditoría

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
82T01243.pdf3,37 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons