Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/16531
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCuesta Andrade, Gregory Guillermo-
dc.contributor.authorMarín Barrera, Erik Javier-
dc.date.accessioned2022-08-23T16:18:57Z-
dc.date.available2022-08-23T16:18:57Z-
dc.date.issued2022-03-03-
dc.identifier.citationMarín Barrera, Erik Javier. (2022). Estudio de factibilidad para la recuperación de oro por el método de lixiviación en pilas - cianuración llevado en la planta de beneficio de la empresa Oroconcent S.A., ubicada en el sector El Tablón del cantón Portovelo en la provincia de El Oro – caso de estudio: “Mina Pique”. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/16531-
dc.descriptionEste trabajo tuvo como objetivo desarrollar un estudio de factibilidad para la recuperación de oro por el método de lixiviación en pilas – cianuración, llevado en la planta de beneficio de la empresa OROCONCENT S.A., ubicada en el sector El Tablón del cantón Portovelo en la provincia de El Oro – caso de estudio: “Mina Pique”. Para ello se usaron ensayos metalúrgicos, incluyendo una minuciosa evaluación económica, con los cuales se determinó la factibilidad del proyecto. La viabilidad técnica se realizó mediante pruebas de: cianuración en botellas y columna de lixiviación; la evaluación económica se efectuó mediante indicadores económicos típicos como el VAN y el TIR. Del ensayo en botella se obtuvo como resultado un 94.4% de recuperación metálica, y de la prueba en columna un 90.88% a una concentración de cianuro de 800 ppm para ambos casos. Los costos de operación varían de 4 y 20 USD/TMS, con un tiempo de retorno de capital del tercer año desde su implementación. El método no requiere de molienda, puesto que la granulometría necesaria es adecuada desde el arranque del material hecho en voladura, tampoco es indispensable de mano de obra especializada para el control de reactivos, consumo energético bajo y se requiere de poca agua; con lo cual reduce los costos de producción considerablemente. Se concluye que lixiviar minerales con metales preciosos extraídos de la mina PIQUE, es factible técnica y económicamente, debido a que se tiene un corto tiempo de recuperación de la inversión y por la viabilidad de extraer minerales de baja ley por el método de lixiviación en pilas, donde los recursos económicos son escasos y la inversión es un factor clave. Se recomienda estudios posteriores muy tecnificados, tanto en el dimensionamiento de pila como del sistema de riego, para una implementación completa del proceso.es_ES
dc.description.abstractThe main objective of the current research work was to develop a feasibility study for the recovery of gold through the heap leaching and cyanidation methods applied to the processing plant of the OROCONCENT SA Company, located in “El Tablón” Portovelo County, “El Oro” Province. The case study called “Mina Pique” used metallurgical tests including a detailed economic evaluation useful to determine the project feasibility. The technical feasibility was carried out through tests of cyanidation in bottles, and then column leaching and the economic evaluation were carried out using typical economic indicators such as: the NPV and the IRR. As result from the bottle test, it obtained 94.4% metal recovery and from the column test 90.88% with a cyanide concentration of 800 ppm for both cases. The operating costs vary from 4 to 20 USD/TM with a capital return time after the third year of its implementation; taking into account that the method does not require grinding due to the necessary granulometry is adequate from the start of the material made in blasting; nor is it essential specialized manpower for the reagents control, besides uses low energy consumption and little water is required reducing production costs. It concludes that leaching minerals with precious metals extracted from the “Mina Pique” is technically and economically feasible, due to the short investment recovery time and the feasibility of extracting low-grade minerals by the heap leaching method where the economic resources are scarce and investment is a key factor. Finally, it recommends further technical studies for the sizing of the heap and the irrigation system for a complete implementation of the process.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFRN;53T0054-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectLIXIVIACIÓNes_ES
dc.subjectRECUPERACIÓN DE OROes_ES
dc.subjectCIANURACIÓNes_ES
dc.subjectFACTIBILIDADes_ES
dc.titleEstudio de factibilidad para la recuperación de oro por el método de lixiviación en pilas - cianuración llevado en la planta de beneficio de la empresa Oroconcent S.A., ubicada en el sector El Tablón del cantón Portovelo en la provincia de El Oro – caso de estudio: “Mina Pique”.es_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalCazar Rivera, Eduardo Santiago-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniería en Geología y Minas

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
53T0054.pdf4,57 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons