Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/15864
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCayán Martínez, Juan Carlos-
dc.contributor.authorPazmiño Bonilla, Luis Germánico-
dc.contributor.authorYaucan Naula, Alex Adrián-
dc.date.accessioned2022-06-13T20:54:21Z-
dc.date.available2022-06-13T20:54:21Z-
dc.date.issued2021-04-14-
dc.identifier.citationPazmiño Bonilla, Luis Germánico; Yaucan Naula, Alex Adrián. (2021). Diseño, implementación y evaluación de un plan de emergencia para el Seguro Social Campesino del Instituto Ecuatoriano de Seguridad Social, en la ciudad de Riobamba, provincia de Chimborazo. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/15864-
dc.descriptionEl presente trabajo de titulación tuvo como objetivo diseñar, evaluar e implementar un Plan de Emergencia bajo el formato de Unidad de Gestión de Riesgos del GADM-R, el mismo que permita atender eventos que alteren las condiciones normales de funcionamiento y que obligue a una respuesta inmediata del personal dentro de las instalaciones del Seguro Social Campesino de Chimborazo. El plan consta de 4 fases. La primera es el diagnóstico de la situación actual, mediante visitas técnicas y aplicación de una lista de verificación. La segunda fase es, comprobar la incidencia de ciertas amenazas (movimiento de masas, caída de ceniza, inundaciones, lahares, explosión de gasolineras, incidencia delincuencial y explosión del Polvorín de la Brigada Galápagos), mediante el software ARcGIS; y simultáneamente, verificar la disposición, estado y operatividad de equipos de emergencia y señalética horizontal. La tercera fase es, la evaluación de riesgos, vulnerabilidades y amenazas, aplicando diferentes métodos como son: FEMA 154, MESERI, MATRIZ DE VULNERABILIDAD y MATRIZ INSHT. La cuarta fase es, el análisis de resultados de los diferentes métodos e implementación del plan de emergencia. Se propuso un conjunto de medidas estructurales y no estructurales, así como acciones preventivas y correctivas que ayudan a mitigar y minimizar el impacto de una emergencia en caso de presentarse. Finalmente, llegando a una conclusión satisfactoria en lo que se refiere a reducción de los riesgos presentados, gracias a las medidas adoptadas, implementación de señalética bajo la normativa NTE - INEN 3864-1, capacitaciones realizadas y participación activa de todo el personal, a la vez, se logró cumplir con las ordenanzas establecidas por parte del GADM-R. Como recomendación, se sugiere actualizar el plan cuando se presenten modificaciones a la infraestructura, ingreso de nuevo personal o cambios de los puestos de trabajo.es_ES
dc.description.abstractThe objective of this research project was to design, evaluate and implement an Emergency Plan under the format of the Risk Management Unit of the GADM-R, which will allow dealing with events that alter the normal operating conditions and that require an immediate response from the personnel within the facilities of the Seguro Social Campesino de Chimborazo. The plan consists of 4 phases. The first is the diagnosis of the current situation, through technical visits and the application of a checklist. The second phase is to verify the incidence of certain hazards (mass movements, ashfall, floods, lahars, gas station explosions, crime, and the explosion of the Galapagos Brigade's powder magazine), using ARcGIS software; and simultaneously, to verify the availability, state and operation of emergency equipment and horizontal signage. The third phase is the evaluation of risks, vulnerabilities, and threats, applying different methods such as FEMA 154, MESERI, VULNERABILITY MATRIX, and INSHT MATRIX. The fourth phase is the analysis of the results of the different methods and implementation of the emergency plan. A set of structural and non- structural measures, as well as preventive and corrective actions, were proposed to help mitigate and minimize the impact of an emergency should it occur. Finally, reaching a satisfactory conclusion in terms of reducing the risks presented, thanks to the measures adopted, implementation of signage under the NTE - INEN 3864-1 regulation, training and active participation of all staff, and at the same time, it was possible to comply with the ordinances established by the GADM-R. As a recommendation, it is suggested to update the plan when there are modifications to the infrastructure, new personnel, or changes in work posts.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;85T00631-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectTECNOLOGÍA Y CIENCIAS DE LA INGENIERÍAes_ES
dc.subjectPLAN DE EMERGENCIAes_ES
dc.subjectGESTIÓN DE RIESGOSes_ES
dc.subjectSALUD Y SEGURIDAD OCUPACIONALes_ES
dc.subjectMÉTODO MESERIes_ES
dc.titleDiseño, implementación y evaluación de un plan de emergencia para el Seguro Social Campesino del Instituto Ecuatoriano de Seguridad Social, en la ciudad de Riobamba, provincia de Chimborazoes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalJácome Valdez, Marcelo Antonio-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
85T00631.pdf7,4 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons