Por favor, use este identificador para citar o enlazar este ítem:
http://dspace.espoch.edu.ec/handle/123456789/15367
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Mejía Flores, Marco Antonio | - |
dc.contributor.author | Cabrera Barrera, Kevin Felipe | - |
dc.date.accessioned | 2022-03-31T14:36:24Z | - |
dc.date.available | 2022-03-31T14:36:24Z | - |
dc.date.issued | 2021-03-31 | - |
dc.identifier.citation | Cabrera Barrera, Kevin Felipe. (2021). Optimización de una malla de perforación y voladura usando las metodologías Holmberg y Konya en la mina Grumintor de la concesión Pinglio. Escuela Superior Politécnica de Chimborazo. Riobamba. | es_ES |
dc.identifier.uri | http://dspace.espoch.edu.ec/handle/123456789/15367 | - |
dc.description | El presente trabajo de titulación tuvo como objetivo optimizar una malla de perforación y voladura usando las metodologías Holmberg y Konya en la mina Grumintor de la concesión Pinglio. Este proyecto se desarrolló como una investigación de campo con un enfoque cuantitativo, mediante la aplicación de las técnicas de observación directa y experimentación; a través del análisis de propiedades físicas del macizo rocoso, principalmente la resistencia de la roca a fuerzas de compresión. Las metodologías utilizadas para el diseño de mallas de perforación y voladura fueron la de Holmberg y la de Konya, en donde se utilizaron fichas técnicas para obtener información sobre las condiciones geológicas de la mina, equipos y herramientas de trabajo; y, características de los explosivos; que permitieron establecer datos numéricos para ser aplicados en las ecuaciones matemáticas de cada uno de los métodos. Posteriormente, con los resultados de cada una de las metodologías, se realizó una comparación, estableciendo ventajas y desventajas de cada una de las metodologías; para establecer la más conveniente durante la actividad de extracción minera en Grumintor. El resultado de la comparación entre metodologías de perforación y voladura determinó que la aplicación de la metodología Holmberg generaría un tamaño de roca reducido que facilitaría la limpieza del área volada; mientras que, la metodología de Konya generaría rocas de mayor tamaño, siendo necesaria la aplicación de voladoras secundarias. De manera que, la aplicación de la metodología de voladura Holmberg, permitiría la obtención de material volado equilibrado; además, del término del ciclo completo de perforación y voladura en menor tiempo. Se recomienda la capacitación y entrenamiento permanente de los trabajadores en diseños y metodologías de perforación y voladura de acuerdo con las características geológicas de cada mina. | es_ES |
dc.description.abstract | This study aims to optimize a drilling mesh and blasting by using Holmberg and Konya methodology in Grumintor mine of Pinglio concession. It was developed as a field research focused on a quantitative approach, a direct observation and experimental technique were applied; it was made an analysis of the physical properties of rock mass, especially about the rock resistance to compressive forces. Methodologies used were based on data sheets to obtain the information about the geological conditions of the mine and working equipments; also, about explosives features, which let establish numeric data to be applied to mathematical equations of each method. Subsequently, based on their results, it was conducted a comparison, setting advantages and disadvantages of each method to determine the most convenient one during the activity of mining extraction in Grumintor. As a result of the comparison between the drilling mesh and blasting, it was determined that the application of Holmberg method would produce a reduce rock size, which would ease projecting area cleaning; instead, Konya methodology would generate bigger size rocks, as it would be necessary applying a secondary demolition. In conclusion, by applying Holmberg blasting methodology, would help to obtain a well-balanced blasted material; also, the drilling and blasting cycle would be completed in less time. It is recommended an ongoing staff training regarding drilling and blasting design and methodology according to the mine geological features. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Escuela Superior Politécnica de Chimborazo | es_ES |
dc.relation.ispartofseries | UDCTFRN;53T00046 | - |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.subject | TECNOLOGÍA Y CIENCIAS DE LA INGENIERÍA | es_ES |
dc.subject | INGENIERÍA GEOLÓGICA | es_ES |
dc.subject | PERFORACIÓN | es_ES |
dc.subject | VOLADURA | es_ES |
dc.subject | HOLMBERG | es_ES |
dc.subject | KONYA | es_ES |
dc.subject | MACIZO ROCOSO | es_ES |
dc.title | Optimización de una malla de perforación y voladura usando las metodologías Holmberg y Konya en la mina Grumintor de la concesión Pinglio | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.contributor.miembrotribunal | Cuesta Andrade, Gregory Guillermo | - |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
Aparece en las colecciones: | Ingeniería en Geología y Minas |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
53T00046.pdf | 3,84 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons