Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/14963
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorVillacrés Parra, Sergio Raúl-
dc.contributor.authorParedes Carrillo, Freddy Andrés-
dc.contributor.authorGuamán Llanga, Darío Fernando-
dc.date.accessioned2022-03-03T17:20:45Z-
dc.date.available2022-03-03T17:20:45Z-
dc.date.issued2021-07-15-
dc.identifier.citationParedes Carrillo, Freddy Andrés; Guamán Llanga, Darío Fernando. (2021). Elaboración de un plan de mantenimiento para los sistemas de captación, planta de tratamiento de agua y tanques de reserva de la EP EMAPAR aplicando la metodología de mantenimiento centrado en confiabilidad. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/14963-
dc.descriptionEn el presente trabajo de titulación se elaboró un plan de mantenimiento para los sistemas de captación, planta de tratamiento de agua y tanques de reserva de la EP EMAPAR aplicando la metodología de mantenimiento centrado en confiabilidad abreviado. El primer punto del presente trabajo fue realizar la evaluación de la gestión de mantenimiento mediante la metodología Delphi y AHP desarrollado en el “Modelo de auditoría para evaluar la gestión de mantenimiento de activos físicos en base a normativa internacional aplicado al caso de estudio: Unión Cementera Nacional (UCEM) planta Chimborazo”, aplicada a la EP EMAPAR, donde se pudo encontrar diferentes puntos de mejora para alcanzar un mejor nivel de referencia en la gestión de mantenimiento. Como segundo punto, se procedió a elaborar el plan de mantenimiento, mediante un proceso que inicio con el levantamiento de la información, actualización del inventario y la codificación bajo los lineamientos de la norma ISO 14224, para posteriormente realizar el análisis de criticidad de los sistemas del agua potable utilizando el método cualitativo, donde se obtuvo que el 31% de sistemas son semi-críticos, y un 69% como sistemas críticos, lo cual es indispensable para seleccionar un modelo de mantenimiento adecuado. Posteriormente se aplicó la metodología del RCM abreviado obteniendo 1433 tareas con sus respectivas frecuencias y logística de mantenimiento para todos los sistemas. El siguiente paso fue el ingresó de la información al Gestor de Mantenimiento Asistido por Ordenador (GMAO), el cual permitió el almacenamiento del plan de mantenimiento de manera ordenada y sistemática. Y finalmente se capacitó al personal de la EP EMAPAR sobre el plan de mantenimiento y el GMAO ayudando a mejorar la gestión del mantenimiento en EP EMAPAR, además, se recomienda implementar el plan de mantenimiento realizado en este trabajo de integración curricular.es_ES
dc.description.abstractIn this research work, a maintenance plan for the catchment, water treatment plant and reserve tanks systems of EP EMAPAR were developed applying the Reliability Centered Maintenance methodology abbreviated. The first point of this work was to perform the maintenance management evaluation using the Delphi methodology and AHP developed in the “Audit model to evaluate the maintenance management of physical assets based on international regulations applied to the study case: Unión Cementera Nacional (UCEM) Chimborazo plant”, applied to EP EMAPAR, in which was possible to find different points of improvement to reach a better level of reference in the management of maintenance. As a second point, the maintenance plan was drawn up, through a process that began by gathering information, updating the inventory and the coding under the guidelines of the ISO 14224 standard, to later perform the critically analysis of purified water systems using the qualitative method, where it was obtained that the 31% of systems are semi-critical and 69% are critical systems, which is essential to select a suitable maintenance model. Later, the abbreviated RCM methodology was applied obtaining 1433 tasks with their respective frequencies and maintenance logistics for all systems. The next step was registering the information the Computer Aided Maintenance Manager (GMAO), which allowed storing the maintenance plan in an orderly and systematic way. Finally, the staff of the EP EMAPAR was trained on the maintenance plan and the GMAO, helping to improve maintenance management in EP EMAPAR, in addition, it is recommended to implement the maintenance plan carried out in this curricular integration work.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;25T00399-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectTECNOLOGÍA Y CIENCIAS DE LA INGENIERÍAes_ES
dc.subjectPLAN DE MANTENIMIENTOes_ES
dc.subjectGESTIÓN DE MANTENIMIENTOes_ES
dc.subjectMETODOLOGÍA RCM ABREVIADOes_ES
dc.subjectMANTENIMIENTO PREVENTIVOes_ES
dc.titleElaboración de un plan de mantenimiento para los sistemas de captación, planta de tratamiento de agua y tanques de reserva de la EP EMAPAR aplicando la metodología de mantenimiento centrado en confiabilidades_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalGallegos Londoño, César Marcelo-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero de Mantenimiento; Ingeniero/a en Mantenimiento Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
25T00399.pdf1,97 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons