Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/14917
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorTenicota García, Alex Giovanny-
dc.contributor.authorLema Suárez, Hugo Marcelo-
dc.contributor.authorPinto López, Antonio Gonzalo-
dc.date.accessioned2022-02-23T17:45:37Z-
dc.date.available2022-02-23T17:45:37Z-
dc.date.issued2021-01-27-
dc.identifier.citationLema Suárez, Hugo Marcelo; Pinto López, Antonio Gonzalo. (2021). Planificación del mantenimiento preventivo y estudio de la distribución en planta de los equipos médicos en imagenología, cirugía, lavandería y rehabilitación del Hospital Universitario Andino de la Universidad Nacional de Chimborazo. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/14917-
dc.descriptionSe realizó el plan de mantenimiento preventivo para equipos médicos e instalaciones de las áreas: Emergencia, Fisioterapia, Imagenología, Laboratorio, Lavandería, Quirófano y UCI del Hospital Universitario Andino de la Universidad Nacional de Chimborazo. Como punto de partida se identificó el problema que radica en la inexistencia de documentación normalizada de mantenimiento y la falta de reglamentación técnica en la ubicación de equipos biomédicos e instalaciones hospitalarias de unidades de servicio. El proyecto contempló etapas de actualización en la documentación técnica, diseño de formatos bitácoras de mantenimiento, planificación y programación de actividades, definición de procedimientos de gestión a seguir, y planteamiento de una redistribución de planta. Se actualizó el inventario técnico, formatos de fichas técnicas, órdenes de trabajo, bitácoras, seguimiento de actividades y manuales. Se priorizó las actividades por equipo, codificación, establecimiento de frecuencias y cronogramas respecto al fondo de tiempo total (FFT). Se estableció los procedimientos específicos para el lanzamiento y seguimiento de las órdenes de trabajo, evaluación de actividades y cálculo de costos, además se evaluó la distribución de planta actual con respecto a factores de infraestructura que incluyen la parte civil, la seguridad, y la condición de instalaciones hidrosanitarias y eléctricas. Los resultados demuestran una mejoría y tecnificación documental en las actividades de mantenimiento preventivo acorde con los recursos existentes y la detección de acciones de mejora para la distribución de los equipos de cada área de servicio en estudio y se sugiere establecer un sistema de gestión de activos en torno a la vida útil de cada equipo médico basados en normativa ecuatoriana aprobada por el ministerio de salud pública, y tomando en cuenta criterios de OMS.es_ES
dc.description.abstractThe preventive maintenance plan was carried out for medical equipment and facilities in the following areas: Emergency, Physiotherapy, Imaging, Laboratory, Laundry, Operating Room and ICU of Andean University Hospital from Universidad Nacional de Chimborazo. As a starting point, the problem was identified, which lies on the lack of standard maintenance documentation and the lack of technical regulations for the biomedical equipment location and hospital facilities for service units. The project included updating stages in the technical documentation, designing log formats for maintenance, planning and scheduling activities, definition of management procedures, and a plant redistribution planning. The technical inventory, technical file formats, work orders, logs, monitoring of activities and manuals were updated. Activities were prioritized by equipment, coding, establishing of frequencies and schedules with regard to the Total Time Background (FFT). The specific procedures for launching and follow-up the work instructions, evaluation of activities and costs calculation were established. In addition, the plant distribution was evaluated regarding infrastructure factors which includes the civil part, the security and plumbing and electric facilities’ conditions. The results show an improvement and documentary technification in preventive maintenance activities according to resources and the detection of improvement actions for the distribution of the equipment in each studied service area and it is suggested to establish an asset management system about useful life of each medical team based on Ecuadorian regulations approved by the Public Ministry of Health, and taking into account WHO criteria.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;25T00388-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectTECNOLOGÍA Y CIENCIAS DE LA INGENIERÍAes_ES
dc.subjectPLANIFICACIÓN DEL MANTENIMIENTOes_ES
dc.subjectMANTENIMIENTO HOSPITALARIOes_ES
dc.subjectMANTENIMIENTO PREVENTIVOes_ES
dc.subjectINDICADORES DE MANTENIMIENTOes_ES
dc.subjectCOSTOSes_ES
dc.titlePlanificación del mantenimiento preventivo y estudio de la distribución en planta de los equipos médicos en imagenología, cirugía, lavandería y rehabilitación del Hospital Universitario Andino de la Universidad Nacional de Chimborazoes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalRedrobán Dillon, Cristian David-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero de Mantenimiento; Ingeniero/a en Mantenimiento Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
25T00388.pdf4,15 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons