Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/14299
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCayán Martínez, Juan Carlos-
dc.contributor.authorQuinllin Tituana, Rony Wladimir-
dc.date.accessioned2021-01-15T18:44:57Z-
dc.date.available2021-01-15T18:44:57Z-
dc.date.issued2020-02-21-
dc.identifier.citationQuinllin Tituana, Rony Wladimir. (2020). Elaboración e implementación de un plan integral de gestión de riesgos para la Dirección Municipal de Tránsito, Transporte Terrestre y Seguridad Vial, perteneciente al Gobierno Autónomo Descentralizado del cantón Guano. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/14299-
dc.descriptionEl objetivo del Estudio y Elaboración de un Plan Integral de Gestión de Riesgos que se desarrolló en el edificio de la Dirección Municipal de Tránsito perteneciente al Gobierno Autónomo Descentralizado Municipal del cantón Guano perteneciente a la provincia de Chimborazo fue evaluar el impacto que tiene la ejecución del Plan Integral dentro de las actividades en materia de prevención de Riesgos. Para realizar el plan se elaboró la matriz de riesgos en la cual se identifica, evalúa y controla los posibles riesgos, se evaluó la variable de riesgo que tiene la edificación, partiendo con ello se siguió los lineamientos que se debe cumplir con lo establecido por la Secretaría de Servicio Gestión de Riesgos y Emergencia. Sabiendo que un Plan Integral de Gestión de Riesgos contempla 5 fases y 4 componentes. La fase 1 del Plan detalla el diagnóstico y análisis de riesgos en este punto es fundamental evaluar las posibles variables a considerar en el estudio y luego elaboración de dicho plan, los lineamientos para la reducción de riesgos establecidos en la fase 2 delimita parámetros, guías para la formulación de políticas y la implementación de normas técnicas vigentes en el país. La fase 3 se encuentra información detallada en gestión de emergencias como las bien denominadas brigadas, además, como debería brindarse la capacitación de estas brigadas ante emergencias. En la fase 4 de la recuperación Institucional donde se establece las actividades a seguir para la resiliencia de la institución, y por último la fase 5 da un seguimiento y evaluación al Plan. Este trabajo técnico establece procedimientos y normas de Seguridad Industrial, socializadas con las partes interesadas de la organización, priorizando a los trabajadores quienes están directamente interactuando con los posibles riesgos laborales de la Dirección Municipal de Tránsito.es_ES
dc.description.abstractThe objective of the Study and Development of a Comprehensive Risk Management Plan developed in the building of the Dirección Municipal de Tránsito belonging to the Gobierno Autónomo Descentralizado Municipal of Guano canton, Chimborazo province, was to evaluate the impact that the execution has in the Comprehensive Plan within the activities in the field of risk prevention. To carry out the plan risk matrix was developed in which the possible risks were identified, evaluated, and controlled; the risk variable that the building has was assessed based on this, the guidelines that must comply with the provisions of the Secretariat of Risk and Emergency Management Service. Knowing a Comprehensive Risk Management Plan includes five phases and four components. Phase one of the Plan details the diagnosis, and risk analysis at this point is essential to evaluate the possible variables to consider in the study. Then, the elaboration of said layout, the guidelines for risk reduction established in phase two delimit parameters, schemes for the formulation of policies, and the implementation of current technical standards in the country. Phase three contains detailed information on emergency management such as the well-known brigades, besides, how the training of these brigades should provide in emergencies. Phase four of the Institutional recovery where the activities followed for the resilience of the institution established; finally, Phase five gives a follow-up and evaluation to the layout. This technical work establishes Industrial Safety procedures and norms, socialized with the interested parties of the organization, giving priority to the workers who are directly interacting with the possible labor risks of the Dirección Municipal de Tránsito.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;85T00570-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectRIESGO LABORALes_ES
dc.subjectCONDICIÓN DE TRABAJOes_ES
dc.subjectMATRIZ DE RIESGOes_ES
dc.subjectRESILIENCIAes_ES
dc.subjectGUANO (CANTÓN)es_ES
dc.titleElaboración e implementación de un plan integral de gestión de riesgos para la Dirección Municipal de Tránsito, Transporte Terrestre y Seguridad Vial, perteneciente al Gobierno Autónomo Descentralizado del cantón Guanoes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalJacome Valdez, Marcelo Antonio-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
85T00570.pdf1,63 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons