Por favor, use este identificador para citar o enlazar este ítem:
http://dspace.espoch.edu.ec/handle/123456789/10649
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Moyano Alulema, Julio Cesar | - |
dc.contributor.author | Sarango Sarango, Angel Benito | - |
dc.date.accessioned | 2019-05-15T13:37:24Z | - |
dc.date.available | 2019-05-15T13:37:24Z | - |
dc.date.issued | 2019-01-14 | - |
dc.identifier.citation | Sarango Sarango, Angel Benito. (2019). Diseño del plan integral de gestión de riesgos institucional para la Escuela de Ingeniería en Contabilidad y Auditoría, de la Facultad de Administración de Empresas de la Escuela Superior Politécnica de Chimborazo. Escuela Superior Politécnica de Chimborazo. Riobamba. | es_ES |
dc.identifier.uri | http://dspace.espoch.edu.ec/handle/123456789/10649 | - |
dc.description | El presente trabajo de titulación tiene como objetivo fundamental el diseño del plan integral de gestión de riesgos institucional para la Escuela de Ingeniería en Contabilidad y Auditoría de la Facultad de Administración de Empresas de la Escuela Superior Politécnica de Chimborazo. Todo esto fundamentado en las cuatro áreas de la gestión de riesgos, con la finalidad de dar protección y salvaguardar la integridad física del personal que labora diariamente en la institución. Para poder cumplir nuestro objetivo se aplicó la siguiente metodología, la cual a su vez sigue el formato de la Secretaria de Gestión de Riesgos Zonal 3. Como primer paso se realizó un diagnostico institucional y su análisis del riesgo, a continuación, se sustentó el análisis mediante normativas legales la cual apoya la elaboración del PIGRI, después se elaboró protocolos de actuación para una gestión eficiente de las posibles emergencias que se podrían suscitar en el entorno, y casi por último se procedió a realizar procedimientos para la recuperación post emergencia. La última fase de este trabajo cosiste en validar, dar seguimiento y planificar y planificar acciones que ayuden a fortalecer el PIGRI en la institución. Los resultados son medidos a medida que se van desarrollando las actividades planificadas y se reducen los riesgos y vulnerabilidades presentes. Se concluyó que las soluciones son satisfactorias en lo referente a los riesgos identificados en la entidad. Se recomienda a las instituciones difundir la importancia de los planes de gestión de riesgos al igual que los beneficios que aportan a todos los integrantes de una organización. | es_ES |
dc.description.abstract | The main purpose of this research work is to design the comprehensive institutional risk management plan for Accounting and Auditing engineering career of Business Administration school in Escuela Superior Politecnica de Chimborazo. All this is based on the four areas of risk management, with the aim of providing protection and safeguarding the physical integrity of the personnel who work daily in the institution. In order to get our objective, the following methodology was applied, which follows the format of Secretaria de Gesti6n de Riesgos Zonal 3. As an initial step, an institutional diagnosis and risk analysis was carried out, and the analysis was then supported through legal regulations which support the elaboration of the CIRMP, then protocols of action were elaborated for an efficient management of the possible emergencies that could arise in the environment, and almost end proceeded to carry out procedures for post-emergency recovery. The last phase of this work is to validate, monitor and plan actions that help strengthen the CIRMP in the institution. The results are measured as the planned activities are developed and the risks and vulnerabilities present are reduced. Itwas concluded that the solutions are satisfactory in relation to the risks identified in the entity. Itis recommended that institutions disseminate the importance of risk management plans as well as the benefits they bring to all members of an organization. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Escuela Superior Politécnica de Chimborazo | es_ES |
dc.relation.ispartofseries | UDCTFM;85T00535 | - |
dc.rights | Info:eu-repo/semantics/openAccess | es_ES |
dc.subject | TECNOLOGÍA Y CIENCIAS DE LA INGENIERÍA | es_ES |
dc.subject | GESTIÓN DE RIESGOS | es_ES |
dc.subject | PROTOCOLOS DE ACTUACIÓN | es_ES |
dc.subject | EMERGENCIAS | es_ES |
dc.subject | RIESGOS | es_ES |
dc.subject | VULNETABILIDADES | es_ES |
dc.title | Diseño del plan integral de gestión de riesgos institucional para la Escuela de Ingeniería en Contabilidad y Auditoría, de la Facultad de Administración de Empresas de la Escuela Superior Politécnica de Chimborazo. | es_ES |
dc.type | bachelorThesis | es_ES |
dc.contributor.miembrotribunal | Guamán Lozano, Ángel Geovanny | - |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
Aparece en las colecciones: | Ingeniero Industrial |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
85T00535.pdf | 3,74 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons